Laserfiche WebLink
) <br />) <br />) <br /> <br />REQUEST FOR QUALIFICATIONS <br />RFQ No.: 11-11-02 <br /> <br />CITY OF SUNNY ISLES BEACH <br />CIVIL ENGINEERING TO DESIGN STREET <br />AND DRAINAGE IMPROVEMENTS <br /> <br />APPROACH AND METHODOLOGY <br /> <br />Methodolo2V and Approach <br /> <br />The City of Sunny Isles Beach has very unique conditions in regards to stormwater management. <br />These features include: I) relatively flat topography, with low lying coastal areas; 2) high ground <br />water elevations, which are subject to tidal influences; 3) environmentally sensitive ecosystems, <br />which are situated in densely populated urbanized areas; and 4) extreme weather patterns <br />associated with tropical storm events. Given the nature of these circumstances and their effects <br />on coastal communities, it is vital that a comprehensive and cost-effective stormwater <br />management system is implemented. The system should comply with the criteria required by <br />the Federal, State and, local regulatory agencies. <br /> <br />The P &A Team has invested considerable effort in examining the scope of this project - both <br />historically and qualitatively. Our design team has reviewed the existing documents and <br />conducted a field review to understand the proposed improvements under this contract. This will <br />prove paramount in helping the P&A Team adhere to any aggressive design schedule and <br />facilitate the completion of construction documents as well as efficiently delegate man-hours, <br />which will stay within the budget. Furthermore, we have identified unique components which <br />will address the line items listed in the scope of services. These items are indentified in the <br />following subsections and our method and approach is designed to produce deliverables that are <br />on time and within the budget. <br /> <br />Survey <br /> <br />The P&A Survey Team shall update and spot check the eXlstmg survey to be provided <br />electronically by the City. Services include verification of horizontal and vertical control used <br />for existing survey and updated survey. Surface features of utilities and permanent <br />improvements shall be shown. Gravity utility lines (i.e., sanitary, and storm sewer) shall have <br />rim elevations verified and inve11s shall be spot checked. The location and verification of all <br />other underground utility lines are not included. Only surface features of the utility shall be <br />verified and located. <br /> <br />Trees and landscaping shall also be verified and updated. Elevations shall be spot checked <br />throughout the project site with particular emphasis in the areas surrounding rim and grate <br />elevations. Elevations shall be relative to the City of Beach Isles Datum. <br /> <br />All survey work shall be done in accordance with the Minimum Technical Standards set forth by <br />the Florida Board of Professional Surveyors and Mappers in Chapter 61 G 17 -6 of the Florida <br />Administrative Code. <br /> <br />C H Perez & Associates <br />