Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH <br />SECTION Two: G.!lALIFICATIONS <br /> <br />r <br />(" <br />r <br /> <br />RICK SCOTT <br />GOVERNOR <br /> <br />'=' ", <br /> <br />, <br /> <br />~'\J <br /> <br />Florida Department of Transportation <br />605 Suwannce Strcet <br />Tallahassce, FL 32399.0450 <br />March 3. 2011 <br /> <br /> <br />.;, <br /> <br />OFFICE OF TIlE <br />SECHETAltY <br /> <br />"\ <br /> <br />Carlos Perez. President <br />C. H. PEREZ & ASSOCIATES CONSULTING <br />Engineers, Inc. <br />9594 NW 41 Street, #201 <br />Doral. Florida 33178 <br /> <br />Dear Mr. Perez: <br /> <br />The Florida Department of Transportation has reviewed your application for qualification package and determined <br />that the data submitted is adequate to qualify your firm for the following types of work: <br /> <br />Group 3 . Highway Design - Roadway <br /> <br />3.1 - Minor Highway Design <br />3.2 . Major Highway Design <br />3.3 . Controlled Access Highway Design <br /> <br />Group 4 . Highway Design - Bridges <br /> <br />4.1.1 - MiscellaneoLls Structures <br />4.1.2 . Minor Bridge Design <br /> <br />Group 5 - Bridge Inspection <br /> <br />5.1 - Conventional Bridge Inspection <br />5.3 . Complex Bridge Inspection <br />5.4 - Bridge Load Rating <br /> <br />Group 6 . Traffic Engineering and Operations Studies <br /> <br />6,1 - Traffic Engineering Studies <br />6.2 . Traffic Signal Timing <br /> <br />Group 7 - Traffic Operations Design <br /> <br />7.1 - Signing, Pavement Marking and Channelization <br />7.2 . lighting <br />7,3 - Signalization <br /> <br />Group 8 . Survey and Mapping <br /> <br />8.1 . Control Surveying <br />8.2 . Design, Right of Way & Construction Surveying <br />8.4 - Right of Way Mapping <br /> <br />www.doLstate.fI.us <br /> <br />-,....- <br /> <br />~!Iv.~I'b KEITH and SCHNARS, P.A. <br />:::J~-~s 12' <br />~, ~':- FWRlDAs /Ji'IDeAL FIRM <br />~ <br /> <br />;;,r.~:wtXIIJ~ .......-- ~ _ <br /> <br />P AG E 20 <br /> <br />RFP#11-11-02 <br />