<br />Mr.Wilson has 26 years of experience in the design and man}gement of highway transportation projects
<br />in Florida and South Carolina. Mr. Wilson joined the cOll'-sultant industry in 1994 after 9 years with
<br />the FDOT. His design experience encompasses complete'project plans preparation and development
<br />including roadway design, traffic operations, drainage, pavement design, environmental permitting and
<br />utility coordination for a multitude of projects including RRR.
<br />
<br />RELEVANT EXPERIENCE
<br />
<br />ANDREWS AVENUE EXTENSION - SEGMENT 5, FPID: 230724-1-32-0, BROWARD
<br />COUNTY, FL: Project Manager for the design and permitting the construction of a 0.5 mile new
<br />4-lane divided roadway from Racetrack Road toAtlantic Boulevard in Pompano Beach, Florida. Includes
<br />the design and permitting of a new closed storm drainage system and retention pond system, two
<br />signalized intersections, signing and marking plans, landscape plans, and a new roadway lighting system.
<br />Client/Contact: FDOT District 4/Anson Son nett, P.E. Phone: (954) 777-4474, em ai/: William. $onnett@dot.state.
<br />{I.us . (5/10 to present)
<br />
<br />SR-713/KINGS HIGHWAY RRR, FPID: 422957-1-32-01, ST. LUCIE COUNTY, FL:
<br />Milling & Resurfacing of a 2-mile section of SR-713/Kings Highway in St. Lucie County from Indrio
<br />Road to Spanish Lakes Boulevard. SR-713 is a rural 2-lane roadway with paved shoulders and swale
<br />drainage. The project also involved widening design for a new left turn lane, signalization upgrades
<br />ADA ramp improvements, signing and marking, sidewalk construction, drainage modifications, utility
<br />coordination, permitting and landscaping. Client/Contact: FDOT District 4/Nadir Rodriguez, P.E.., Phone:
<br />(954) 777-4385, email: nadir.rodriguez@dot.state.{I.us. (12/08 to Present)
<br />
<br />I-95-SFRC SOUND BARRIER WALLS DESIGN-BUILD, BROWARD COUNTY, FL: Design
<br />project Manger for desing build team tasked with design, permitting and construction of 3,500-ft
<br />of 21-ft high noisewall adjacent to the South Florida Rail Corridor (SFRC) and 1-95. The project
<br />included overhead and underground utility coordination and development of avoidance strategies.
<br />Also designed the reconstruction of adjacent Lone Pine Lane and developed construction staging plans
<br />that minimized impact to adjacent trailer park residents. Responsible for all environmental, drainage
<br />and rail corridor permitting. Client/Contact: FDOT District 4/Leslie Wetherell, P.E. Phone: (954) 777-4438,
<br />email: leslie.wetherell@dot.state.{I.us. (11/06 to 7/07)
<br />
<br />ANDREWS AVENUE EXTENSION - SEGMENTS 2 AND 3, FPID: 230622-1-32-01 &
<br />230725-1-32-01, BROWARD COUNTY, FL: Keith and Schnars designed and permitted the
<br />construction of a 1.5 mile new 4-lane divided roadway from Atlantic Boulevard to NW 10th Street.
<br />This portion of the project included the design of a grade separated bridge crossing of Andrews
<br />Avenue over the CSX rail corridor and Martin Luther KingJr. Boulevard.Also included were the design
<br />and permitting of a new closed storm drainage system and retention pond system, four signalized
<br />intersections, signing and marking plans, landscape plans, and a new roadway lighting system. Client/
<br />Contact: FDOT District 4/Donovan Pessoa, P.E. Phone: (954) 777-4442, email: donovan.pessoa@dot.state.{I.us.
<br />(12/02 to 8/05)
<br />
<br />TRI-RAIL DOUBLE TRACKING PRO]ECT:Design Project Manager responsible for the
<br />production of construction documents for the track corridor drainage and site grading design as
<br />well as roadway grade crossing designs for all 72 at-grade rail crossings within the 44-mile Segment
<br />5 corridor. All design was developed to FDOT design criteria and all plans produced followed
<br />FOOT CADD guidelines. The project scope involved storm drainage, roadway grade crossing plans,
<br />striping plans, signal plans, as well as utility coordination, permitting and specifications preparation.
<br />Contact Dan Mazza, SFRTA, Phone: (954) 788-7893. (8/0 I to 4/06)
<br />
<br />CROSSTOWN PARKWAY/I-95 INTERCHANGE, ST. LUCIE COUNTY, FL: Senior Designer
<br />directing project design staff involved in development and preparation of roadway construction
<br />documents including roadway plans, storm drainage, traffic control plans, signing and pavement marking
<br />plans, signal plans, and specifications. Also assisted the Project Manager with the development the
<br />Preliminary Engineering Report, drainage reports, permitting and day-to-day coordination between
<br />the FOOT, City of Port St. Lucie and multiple Developers. The project scope involved construction
<br />of a new tight diamond interchange connecting Crosstown Parkway (Previously called West Virginia
<br />Drive) to 1-95. Clients/Contact: City of Port St Lucie/Roxanne Chesser, P.E. Phone: (772) 871-5186, emai/:
<br />RoxanneC@cityofpsl.com. FDOT District 4 Coordination/Leslie Wetherell, P.E. Phone: (954) 777-4438, emai/:
<br />leslie.wetherel/@dotstate.{I.us. (6/04 to 5/07) ~
<br />,_ ~__~"'>" "",, :::\I;"'~I'~ KEITH and SCHNARS, P.A.
<br />:l J~}0 / FLORlOAs Bit IDCAL FIRM
<br />~
<br />
<br />RFP #11-11-02
<br />
<br />PAGE 33
<br />
|