|
<br />
<br />)
<br />),'
<br />
<br />PROFESSIONAL
<br />Q!lALIFlCATIONS
<br />Qualified: Stonnwater
<br />Management Inspeaor,
<br />Florida Department of
<br />Environmental Protection
<br />(FDEP) and Broward County
<br />Department of Planning and
<br />Environmental Protection
<br />(BCDPEP)
<br />
<br />Certified as a CSX Tri-Rail
<br />On- Track Safety Inspeaor
<br />
<br />Mr. Hahn is an engineering ,professional specializing in civil engineering and permlttrng. "His
<br />experience in the Construction of Municipal and Governmental Structures offers a broad-based
<br />combination of Land Development and Civil Engineering. Mr. Hahn has more than 15-y'~ars
<br />experience in the design and Construction Administration/Management of water, sanitary
<br />sewer, paving, grading and drainage systems for Consultant Engineering firms. Prior to his
<br />accomplishments in Engineering, Mr. Hahn was employed as a Land Development professional
<br />with an additional 18-years experience employed by Home Builders and Developers specializing
<br />in the construction of residential, multi-family, commercial and municipal developments. He
<br />traveled throughout the State of Florida to evaluate the most efficient and cost effective sites
<br />for development. Prepared site evaluation, cost analysis and budgeting reports. Successfully
<br />managed site preparation and development, planning and engineering services with consultant
<br />engineering and architectural firms.
<br />
<br />RELEVANT EXPERIENCE
<br />
<br />CITY OF FORT LAUDERDALE ENGINEERING DEPARTMENT, BROWARD
<br />COUNTY, FL: Supervised daily inspection of Site Development Improvements for several
<br />City Municipal projects while employed by Keith and Schnars. Projects include; One Stop Shop,
<br />Sunset Memorial Gardens and Central Parking Garage, Phases I and 2 repairs. Client/Contact
<br />City of Fort Lauderdale/Paul Bohlander, PE, Phone: (954) 522-2604.
<br />
<br />WATERWORKS 2011 PROGRAM, FORT LAUDERDALE, FL: Mr. Hahn has worked
<br />with the Program Management Team since its initial phase construction of Miami Road a
<br />neighborhood Redevelopment project in Southeast Fort Lauderdale. Client/Contact City of Fort
<br />Lauderdale/Paul Bohlander, PE, Phone: (954) 522-2604. (2003)
<br />
<br />MIAMI ROAD REDEVELOPMENT, FORT LAUDERDALE, FL: The initial phase of
<br />the Waterworks 20 II Neighborhood Improvement Project for the City of Fort Lauderdale
<br />Public Works Department. Project consisted of the conversion of 300-residential units
<br />from septic tanks to gravity sewers, water main construction, testing and certification and
<br />the general restoration of the neighborhood. Reported to the Program Management Team
<br />while supervising the projects Resident Project Representative (RPR). Responsibilities include
<br />Office Management Administration. Project had a 400-day construction timeframe and was
<br />constructed in 180-days. Client/Contact City of Fort Lauderdale/Paul Bohlander, PE, Phone: (954)
<br />522-2604. (2002)
<br />
<br />WESTGATE CRA, PHASES 1 AND 2, WEST PALM BEACH, FL: Funded by the State
<br />of Florida and the Westgate Community Redevelopment Agency (CRA), this 6-Phase project
<br />consists of Surface Water Management, Water Distribution and Fire Protection, Sanitary
<br />Sewer and Roads. Responsibilities include working very closely with the CRA and Palm Beach
<br />County Construction Coordination to administer the construction of sanitary sewer and water
<br />distribution systems, supervising the inspection aspects as well as assurance that the contractor
<br />complies with the construction documents. Client/Contact Westgate Belvedere Hones CRA/Elizee
<br />Michel, Phone: (561) 233-3626. (9/08 to 4/ 10)
<br />
<br />TRI-RAIL REDEVELOPMENT,BROWARD AND PALM BEACH COUNTIES, FL:
<br />Renovation of T ri-Rail Stations in Broward and Palm Beach Counties. Responsible for the
<br />coordination and office management of the Civil Engineering infrastructure improvements
<br />located within the Tri-Rail impact corridor. Successfully completed the "On-Site, Tri-Rail
<br />Safety Program". Duties included implementation of the construction documents, inspection
<br />of sanitary sewer, potable water and surface storm water management systems.
<br />
<br />LOGGERS' RUN PUD, PALM BEACH COUNTY, FL: 1840-acre development west
<br />of Boca Raton. Assisted in the zoning, site planning and coordinated civil engineering of a
<br />multi-use residential community. _
<br />,----IM.I_.~r~.:.,~~i. <,c, ::ld/"\I'~ KEIrn and SCHNARS, P.A.
<br />:: J~)0 / FIDRIDAs Bit IDCAL FIRM
<br />------
<br />
<br />RFP #11-11-02
<br />
<br />P AG E 37
<br />
|