Laserfiche WebLink
<br /> <br />Bayo Coker, P.E.) <br /> <br />~?, <br /> <br />.:?, <br /> <br />Biscayne Blvd (SR 5) Reconstruction & Pump Station, Miami-Dade County (FPID No. 249835-2-52-01) <br /> <br />Project Lead Drainage Engineer responsible for drainage design, permitting, plan production hydraulic modeling and <br />report writing of the drainage report of over 2 miles of SR 5 roadway widening and reconstruction improvements. Project <br />included Pump station design 30 deep wells which involved coordination and interaction DERM, FDEP and SFWM. (Project <br />Manager, Yuanet Letzelter, P.E.) <br /> <br />Biscayne Blvd (SR 5) Reconstruction from N.E 67 to N.E. 87, Miami-Dade County (FPID No. 405641-2-52-01) <br /> <br />Drainage Engineer responsible for drainage design, permitting, plan production hydraulic modeling and report writing of <br />the drainage report of over 1.5 miles of SR 5 roadway widening and reconstruction improvements. Project included over <br />30 deep wells and French Drain design which involved coordination and interaction DERM, FDEP and SFWM. (Project <br />Manager, Mohammed Mansuri, P.E.) <br /> <br />Miami-Dade County NW 8ih Ave and NW 1ih ST Street Improvements <br /> <br />Project Engineer in charge of one mile roadway resurfacing and drainage design, utility coordination and preparation of <br />construction plans, documents, and specifications for the project. Project included resurfacing and French Drain design <br />and hydraulic modeling Reference: (Project Manager Ricardo Salazar, P.E.) <br /> <br />Roadway Design <br /> <br />As a project engineer, participated in the overall roadway and drainage design and plan production of several state, <br />resurfacing and reconstruction projects. Plan production was conducted by using MicroStation and Geopak <br /> <br />Technical Review <br /> <br />As a project Drainage Engineer, participated in the review of preparation of plans and specifications for a myriad FDOT <br />roadway and Bridge Projects municipal projects such as water mains, sanitary sewers, storm sewers and sanitary pump <br />station and bridge hydraulic reports. These reviews included checking for form, format, procedures, methodology, and <br />summaries. The plans were also checked for coordination between Plans, Computation Book, CES, technical special <br />provisions such as water quality and flood routing, and the interfacing of local and federal permitting agencies. <br /> <br />NDPES Coordination <br /> <br />Help in the preparation of documents, which facilitates the local NDPES agreement with FDEP and DERM. The NDPES <br />Coordinator is (Jamie Barrera) <br /> <br />Rail Coordinator <br /> <br />As a project engineer, was principal in charge of the maintaining contract and invoices between FDOT and Rail Companies. <br />Duties also included JPA agreements with local governments. and Rail Road entities <br /> <br />Permitting for Land Development <br /> <br />As a project engineer, participated in the review of plans and specifications for subdivision, commercial and industrial <br />sites, parking lot grading and drainage for the permitting agency of FDOT. <br /> <br />Engineers & Surveyors dedicated to Transportation Development and Operations <br /> <br />Page 2 of 2 <br />