Laserfiche WebLink
<br />) <br />) <br />) <br />) <br /> <br />) <br /> <br /> <br />Prolection Resources <br /> <br />T&M PROTECTION RESOURCES, LLC - RFP # 12-01-02 - PAGE 44 <br /> <br />also included the use of green infrastructure techniques such as bio-swales and structural soil cells to filter <br />storm drainage flow and provide adequate soil in the root zones of proposed shade trees. Mr. Garrahan is <br />responsible for site planning and design. <br /> <br />) <br /> <br />) <br /> <br />Bethpage State Parkway Bikeway, ABC #3, Nassau County, NY; 1/08-Present. <br />Client: New York State Dept. of Transportation <br />]'vIr. Garrahan served as project manager for this project involving a shared use path that is approximately <br />fifteen miles in length. The path connects with the existing Bethpage State Park trail and runs northward <br />through Trail View State Park and on public roads to its terminus at the Syosset Railroad Station. The <br />completed trail system provides recreational opportunities to the Long Island residents and will provide an <br />alternative transportation mode facility that connects to a mass transit outlet. This final design project will <br />require plans, specifications, construction cost estimate and close coordination with New York State Office <br />of Parks, Recreation and Historic PresenTation, Nassau County and the Town of Oyster Bay due to <br />overlapping jurisdiction issues. <br /> <br />, ) <br /> <br />) <br /> <br />) <br />) <br /> <br />) <br /> <br />Reconstruction of NY 347 from Rte. 454 to NY 25, Smithtown, NY; 11/07-Present. <br />Client: New York State Dept. of Transportation <br />Mr. Garrahan is selving as the senior landscape architect on this $150-million final design project involving <br />NY 347, NY 111, NY 25 and 12 side streets. The project will be advanced under three separate contracts, <br />each requiring final plans, specifications and construction cost estimates. The original focus of the project was <br />to address the capacity issues of this major regional arterial roadway. After award, the NYSDOT decided to <br />advance this project under their newly adopted "Vision Plan". This plan incorporates a program titled <br />GreenLITES, which is modeled similar to the well known LEED program for building oriented projects, and <br />emphasizes the use of a sustainable design approach for transportation projects. On the 347 project, this <br />approach includes a focus on landscape restoration and addressed multi-modal traffic via a proposed shared <br />use path. The shared use path will be designed to effectively create a linear park complete with formal rest <br />stops called "Green Stops"; educational kiosks; bio-swales to improve storm water quality prior to infiltration; <br />solar lighting; and aesthetic improvements through the use of a variety of materials such as brick pavers, <br />imprinted concrete, modular textured walls, and attractive site furniture. Mr. Garrahan has been involved in <br />the design of the shared use path and its facilities, especially the development of the initial "Green Stop" and <br />bio-swale/ rain garden. ]'vIr. Garrahan's responsibilities also included input on the visualization materials <br />prepared to depict the proposed noise walls. These were used when meeting with adjacent property owners. <br /> <br />. ) <br /> <br />) <br /> <br />) <br /> <br />" ) <br /> <br />} <br /> <br />Northern State Parkway and Long Island Expressway Interchange Improvements at NY 110, <br />Huntington, NY; 6/03-Present. Senior Landscape Architect. <br />Client: New York State Dept. of Transportation, Reg. 10 <br />This project includes preliminary and final design selvices for the replacement of the existing NSP Bridge <br />over NYS Route 110 and its interchange along with widenings on NYS Route 110 from four to six lanes <br />between LIE and NSP. Mr. Garrahan was responsible for the preparation of the project Visual Resources <br />Assessment and Visual Impact Assessment along this heavy commercial corridor within the Town of <br />Huntington. Determination of user groups and view sheds within the project corridor and the development <br />of the VIA appendix to be included with the CR/EIS of this project. During final design, ]'vIr. Garrahan will <br />be responsible for performing detailed tree sUlveys and for the landscape design. <br /> <br />T&M PROTECTION RESOURCES, LLC - RFP # 12-01-02 - PAGE 44 <br />230 Park Avenue, Suitc 440, Ncw York, NY 10169 . tel: 212.422.0000 . tux: 212.422.3305 . www.tmprotcction.com <br />This business is liccnsed by the New York Departmcnt of Statc, Division of Licensing Scrviccs <br />