Laserfiche WebLink
r <br /> INTERNATIONAL GENERAL CONTRACTOR <br /> Project: Gateway Park-Pedestrian Bridge Date: 02/16/12 <br /> Location: City of Sunny Isles Beach,Florida <br /> Park Cost Estimate Summary <br /> Noce Item Description nmo�M ) <br /> nito«�oo.uo� Cost/Unit Total Remarks <br /> 2000 SITEWORK <br /> Sod(Installed) 10,000 SF 1.00 10,000.00 <br /> Plaza/Walkways(pavers) 4,000 SF 7.00 28,000.00 <br /> Drainage/Site Utilities 1 UN 60,000.00 60,000.00 <br /> Landscape Planting 1 UN 50,000.00 50,000.00 Allowance <br /> Bridge Installation-Site related costs 1 UN 75,000.00 75.000.00 <br /> 3000 CONCRETE <br /> Concrete/Masonry-Towers 2 UN 275,000.00 550,000.00 Including foundations <br /> 4000 MASONRY <br /> CMU-Included under Concrete 0.00 <br /> 5000 METALS <br /> Metal Panels/Screens 1 UN 90,000.00 90,000.00 <br /> Stairs 2 UN 70,000.00 140,000.00 <br /> 6000 CARPENTRY/WOOD&PLASTIC <br /> Included under Concrete 0.00 <br /> 7000 THERMAL MOISTURE <br /> Included under Concrete 0.00 <br /> 8000 DOORS&WINDOWS <br /> Metal Doors 2 UN 2,000.00 4,000.00 <br /> 9000 FINISHES <br /> Stucco-Included under Concrete 0.00 <br /> Paint 1 UN 20,000.00 20,000.00 <br /> 10000 SPECIALTIES <br /> Not Applicable 0.00 <br /> 11000 EQUIPMENT <br /> Not Applicable 0 0.00 <br /> Arend' aTfem . 3 <br /> Page 1 of 2 <br /> Date 3 - <br />