|
PROJECT: Sunny Isles-Garage_Park
<br /> LOCATION: Sunny Isles Beach,Florida
<br /> 6/13/2011
<br /> 1 Schematic Estimate-Garage Park •
<br /> CM UM UN?DM TOT,1 GARAGE Pet Grand Tools
<br /> @ stair/elevator towers
<br /> Total Roofing $10,192
<br /> Subtotal Thermal/Moisture Protection $194,692 $0 _
<br /> Tota Ie:,, al Moistuc g • ection S194,692
<br /> 6) DOORS
<br /> Hollow Metal Doors&Frames
<br /> 3'-0'xT-0•Honow metal kerne 13 ea $150.00 51,950 $1,950
<br /> 3'-0°x 7-0'Hollow metal door 13 ea $190.00 $2,470 $2,470
<br /> Subtotal Hollow Metal Doors&Frames $4,420
<br /> Total Hollow Metal Doors&Frames $4,420
<br /> Finish Hardware
<br /> Single door 13 ea $400.00 $5,200 $5,200
<br /> Total Finish Hardware - $5,200
<br /> Door&Hardware Installation -
<br /> single door 13 ea $150.00 $1,950 $1,950
<br /> Total Door&Hardware Installation $1,950 $1,950
<br /> I i l
<br /> \ subtotal Doors $11,570 $0 _
<br /> Total Doors $11,570
<br /> 71 FINISHES _ _
<br /> stucco.Lath&Plaster _
<br /> -
<br /> Exterior Stucco Right Texture) 1,190 sr $47.00 $55,930 $55,930
<br /> Miscellaneous swan 1 Is $25,000 $25,000 $20,000 $5,000
<br /> -
<br /> Subtotal Stucco,Lath&Plaster $75,930 $5,000
<br /> Total Stucco,Lath&Plaster _ $80,930
<br /> Drywall
<br /> Miscellaneous drywall walls&ceilings 1 Is $7,500 $7,500 $7,500 _
<br /> Total Drywall _ $7,500
<br /> Ceramic _
<br /> Ceramic 1 Is $17,600 $17,600 $17,600 4 e_ _
<br /> '
<br /> Total Ceramic $17,600
<br /> Paintine
<br /> Paint doors&frames 13 ea $75.00 $975 $975 _
<br /> Paint seem 10,708 sf $2.00 $21,416 $21,416
<br /> hint drywall walls/ceiltngs 2,000 sf $1.00 $2,000 $2,000
<br /> Paint CMU 10,450 sf $1.00 $10,450 $10,450
<br /> Paint garage walls MC MC _
<br /> Paint garage columns MC MC _ _
<br /> Paint garage reVmgs NIC MC _
<br /> Sealed concrete floors p Mach&elect roams 330 sf $1.50 $495 $495
<br /> Miscellaneous painting 1 6 $15,000 $15,000 $10,000 $5,040
<br /> Subtotal Painting $45,336 $5,000
<br />
|