Laserfiche WebLink
Mr.Nan Cohen <br /> Mardi 20,2012 <br /> 13. Make°Exotic Planter" a dry planter—no water feature at this location. <br /> 14. Study and adjust the proximity of the plaza trees to the kids water feature—Avoid leaves <br /> from dogging the water jet system. <br /> 15. Great Lawn shall maintain a constant elevation as originally designed. <br /> 16. Provide a 30'x60' stage with a 12'x20' back room and stage floor to be 42" above <br /> adjacent walkway flooring. —To be designed for a total budget of$500,000.00 <br /> 17. Provide landscape lighting fixtures with outlets. <br /> 18. Provide sufficient electrical panel capacity for other park activities and/or functions <br /> 19. Do not use lemon or fruit trees on park. <br /> 20. Do not use Sabal palms and make landscaping budget an allowance in order to <br /> determine the specific tree species a later time — It is preferred to use a variety of trees <br /> similar to Fairchild Garden. <br /> 21. Provide three (3)flag poles at the northeast corner of the site. <br /> 22:Slope top of crash wall to avoid kids form walking on surface. <br /> 23.All three(3) Kids Play Equipment apparatus to remain as originally designed. <br /> 24. Leave Kids Water Court and the Water Wall. <br /> 25.Leave the Playground Cover for three apparatus. <br /> 26.4"' Level Banquet Hall and Restaurant will not be included as part of the scope of work. <br /> 27. Provide a HC restroom for the stage back room. <br /> Note: Due to the fact that at this time there is no soil report or structural engineer design, we <br /> will maintain a structural slab inside the storage room. Once we engage in the Design <br /> -) Development Phase and this issue is further reviewed we can make a better assessment on <br /> ( what type of slab better suits the project and achieves the target budget. The cost for a non- <br /> structural floating slab is estimated at $20.00 SF (Including the fill required to achieve the same <br /> level of the building ground floor slab). <br /> Please keep in mind that many of these items are of a technical nature that will be incorporate in <br /> the project documents during the Design Development and Construction Document Phase, <br /> therefore they are not reflected on the Site Plan Approval documents at this time. <br /> Summary of Total Project Costs <br /> Parking Structure Contract= $10,000,000.00 <br /> Additional items to Parking Structure under contract dated 7121111 submitted for <br /> approval: <br /> Foundation improvements for 4"' Level Construction: $ 490,000.00 <br /> Park Improvements (60,000 SF Site) = $ 3,734,321.00 <br /> Pedestrian Bridge and Towers = $ 2,217,941.00 <br /> Performance Stacie = $ 500,000.00 <br /> Total = $ 6,942,262.00 <br /> Less Fire sprinkler credit (2 floors) = ($ 100,000.00) <br /> Adjusted Total= $ 6,842,262.00 <br /> Page 2 of 3 <br />