My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1871
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2012 3:18:07 PM
Creation date
4/18/2012 3:14:30 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1871
Date (mm/dd/yyyy)
03/15/2012
Description
Awd RFP12-01-02&Agmt w/T&M Protection Resources re Security Consult
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T~ <br /> <br />ProteroooResources <br /> <br />T&M PROTECTION RESOURCES, LLC - RFP # 12-01-02 - PAGE 7 <br /> <br />(ConOps) to address these needs and work with the City to ensure that <<ntral monitoring capabilities are <br />part of tbe planning efforo;, <br /> <br />During the course of thi<; effort, various equipment systems will be researched and the advantages or <br />disadvantages of various systems would be outlined to the city for consideration. The team will develop a <br />schematic of what equipment would be placed and wbere it would be located on appropriate mapping. <br /> <br />A Secu.tily Master Plan report would be prepared that would outline all activities and assessments couducted <br />to develop the final set of recommendations. An order of magnitude construction cost estimate for purchase <br />and instJlllation of systems will be prepared and included. After coor<lination and review with City <br />representatives, the end results 'would be assembled in to a final Security Master Plan document that <br />addresses all aspects of securing the City and its patrons, <br /> <br />Phase 2 commences after review, conunent and agreement with the City regarding the system types to be <br />installed. locations, extent of monitoring and communications mediums back to the central monitoring <br />location. Again, while the level of effort cannot be detailed at this time, T&M would envision the folJowing <br />cngineering effort would be required to develop the contract plans necesslUj' [or complete implementation: <br />o Request for Proposal Development <br />o RFP Response Review (Bid Assistance) <br />o Construction Administration (Installation Monitoring & Acceptance) <br /> <br />'J'&M PROTECTION RESOURCES. J,l,C -11F1' # 12-01-02- PAGE 7 <br />230 Park Avenue, Suite 440, New York, NY 10169. tel: 212.422.0000. fax: 212.422.3305. www.tmprotection.c11!1 <br />This business is licensed by the New Yark Department of State, Division of Licensing Services <br /> <br />',-": <br /> <br />,i <br />r'. <br />l_" <br />
The URL can be used to link to this page
Your browser does not support the video tag.