Laserfiche WebLink
<br />T~ <br /> <br />Protection Resources <br /> <br />T&M PROTECTION RESOURCES. LLC - RfP # 12-01-02 - PAGE 34 <br /> <br />Eight Bridges Component Rehabilitation, HllCR02B, V.rious Locations, NY; Bill-Present Senior <br />Structw:a1 Engineer. <br />Client: New York City Dept ofTr""sportation <br />This is a total design and construction support services contract for the rehabjJitation of eight bridges in all <br />five boroughs of New York: City. Mr. Macaroff's responsibilities include inspection of steelsupe:rstructurcs in <br />response to Red Flags issued by the NYSDOT; load ratings for all bridges; and prepararion of inspecrion <br />findings rcport and dcsign of repair details. <br /> <br />Steel Bridge Rebabllitation Final Design (phases V-VI), Nassau and Suffolk Counties, NY; 10/10- <br />Present. Structural Engineer. <br />CHent: New York State Dept. ofTr""sportatiom <br />The project involves in-depth inspection of 16 multi-span ,teel stringer bridges located throughout Nassao <br />and Suffolk Counties to detennine their current condition in order to establish the required :rehabilitation <br />work to be performed at each structure. Mr. Macaroffs responsibilities include load racing and developing <br />structw:a1 repair details. <br /> <br />NYCDOT Nine Bridges Component Rehabilitation, HBCR01C, Varions Loc.tions, NY; 2/09- <br />Present, Senior Structural Engineer. <br />CIlent: New York City Dept. ofT.""sportatioo <br />Tbis is a total design and construction support services contract for the rehabilitation of nine bridges in the <br />boroughs of Manhattan, Queens and Staten Island. This project consists of repairing the fascia girder and <br />interior girders due to a vehicle collision. Mr. Macaroff's .responsibilities include inspection of steel <br />superstructures in response to R<d Flags issued by the NYSDOT, load ratings for ail hridges and design of <br />repair details. Thc nine bridge, are: Roosevelt Avenue Bridge over Park Road; Ramp from Queensboro <br />Bridge over Bridge Plaza South; BOth Road over LIRR; Douglaston Parkway over Cross Island Parkway NB; <br />Ramp to Queensboro Bridge over E. 59th Street; 715t Avenue over Cooper Avenue; HllIllliih Street over <br />SillT; Forest Park Avenue over Clnve Lake; Doughston Parkway over Ctoss Island Parkway SB. <br /> <br />Roosevelt Is!and Bridge Construction Support Services (CSS), New York, NY; 3/0B-Present. <br />Structural Engineer. <br />Client: New York City Dept. ofT..nsport.tion <br />This project involves providing construction support services to NYCDOT for the rehabilitation of the <br />Roosevelt Island Bridge and its approach roadways. The project also involves perfotming shop drawing <br />review, technical review of contractorts inquiries during construction, and coordination of C5S work <br />performed by subconsultants. Mr. Maca.roff is responsible for shop drawing review, answering contractor's <br />RFl's, and field inspection to resolve construction issues. <br /> <br />Catom ""d Church Avenue Ilridge Rehabilitation, Brooklyn, NY; 2006-Present <br />Senior Structural Engineer, <br />Client: New York City Dep!. ofTrmn.portation <br />This project involves total design and construction support services for the rehabilitation/ replacement of the <br />Caton Avenue, St. Paul's Place, Church Avenue aDd East 18th Street Bridges. Mr. Macaroff is responSIble for <br />analysis and design of integral abutment and isotropic concrete bridge deck, and layout of jacking pits for <br />micro tunneling of utilities under active rail lines. <br /> <br />T &M l'ROTECTION RJ<;SOURCES, LLC - RFP # t2-~ 1-02 - PAGE 34 <br />230 Park Avenue, Suite 440, New York. NY 10169 . tel: 212.422.0000. fax: 212.427..3305 . www.tmprotection.ccm <br />This business is licensed by the New York Department of State, Division of Licensing Servil;es <br /> <br />,"'. <br /> <br /><" <br /> <br />! _:~ <br />