Laserfiche WebLink
o Ha!,~2t!~gn~ <br /> <br />Approach Methodolgy <br /> <br />Heritage Park <br />We designed a custom sail structure for Heritage Park. Aesthetics was the critcal factor in how we designed this <br />location. Not only is our design astheically pleasing, it is functional and durable. Free form sails are the perfect <br />solution, providing an open flow design. The proposed custom design achieves all requirements, and then some. The <br />sails are a feature and functional art piece within their own right. This design provides an inviting area for children and <br />adults alike. Creating a fun family place to play and relax. The proposed custom design has award winning potential. <br />. Supporting structure engineered to 146 mph per Florida Building Code 2007 for Miami Dade County. Tops to be <br />removed at 90 mph <br />. All cabling and fittings are stainless steel <br />. Due to placement of columns there will be minimal damage to rubber surface. <br /> <br />Schedule of Proposed Services for Heritage Park <br />This is a Progressive Schedule <br /> <br />Once bid is awarded, execute agreement and provide bonds <br />Design Drawings, Site Survey <br />Engineering after final design has been approved <br />Permitting submittal <br />Manufacturing & delivery <br />Installation of supporting structure <br />Site measure for custom sails <br />Manufacturing & delivery of sails and supply of fittings and cables <br />Delivery of sails to site <br />Installation of sails <br /> <br />2 weeks <br />3 weeks <br />3 weeks <br />2 weeks <br />6 - 8 weeks from approval of building permit <br />2 to 3 weeks <br />2 days <br />3 -4 weeks <br />1 week <br />3 days <br /> <br />'Installation times are subject to weather conditions. <br /> <br />Installation Details: <br />1. Supply labor, material and equipment to erect 10 sails (shade cloth) with 11 columns. <br />2. Excavation, rebar and concrete as required, a total of 8 foundations. <br />(2) @ 6.5' X 6.5' X 4' (3) @ 8' X 8' X 4' (3) @ 12' X 12' 4' <br />3. Layout and placement of anchor bolts for all columns <br />4. Layout, drill and epoxy a total of 15 wall brackets. <br />5. Removal and replacement of 388 square foot PPI rubber surface. A total of 3 columns. All remaining 5 columns are <br />located in landscape areas. <br />6. Private underground utilities locating company before any excavation starts. <br />7. Protection of brick pavers and rubber surface during construction. <br />8. Non-shrink grout under all column base plates. <br />9. Total clean up of the site (Daily). <br /> <br />n. <br />,\ " '.-. <br />" . <br /> <br />ATTACHMENT "A" <br />