My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-04-03 Acoustic Engineering Consult Svcs Town Center Park
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2012 4:45:00 PM
Creation date
4/23/2012 4:43:02 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Acustic Engineering
Bid No. (xx-xx-xx)
12-04-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2.10.1 Cancellation and Re-Insurance: <br /> <br />If any insurance should be canceled or changed by the insurance company or should any <br />insurance expire during the period of this contract, the Contractor shall be responsible for <br />securing other acceptable insurance to provide the coverage specified in this section to <br />maintain coverage during the life of this Contract. All deductibles must be declared by <br />the Contractor and must be approved by the City. At the option of the City, either the <br />Contractor shall eliminate or reduce such deductible or the Contractor shall procure a <br />Bond, in a form satisfactory to the City, covering the same. <br /> <br />2.11 MONTHLY INVOICES PAYMENTS <br /> <br />Cut-off date is the close of the last business day of the month. Vendor shall submit by the 10th <br />day of the following month vendor's completed Statement of Services/Invoice. Should the 10th <br />fall on a weekend or holiday, Consultant shall submit his application on the next workday. <br /> <br />Vendor is advised that processing of invoices must follow this schedule, as the City has funding <br />requirements and other payment obligations which may prevent payment of late Statement of <br />Services for that month's billing cycle. A late Statement of Services with a recommendation for <br />payment will be paid in the next month's billing cycle. <br /> <br />2.11 NOTIFICATION TO BEGIN WORK SHALL BE GIVEN THROUGH A <br />NOTICE TO PROCEED: <br /> <br />The proposer shall neither commence any work, nor enter a City work premise, until a written <br />Notice to Proceed (NTP) directing the proposer to proceed with the work has been received by <br />the proposer from any authorized City manager or his designee representative; provided <br />however, that such notification shall be superseded by any emergency work that may be required <br />in accordance with provisions included elsewhere in this solicitation and resultant contract. <br /> <br />2.12 FEDERAL AND STATE REGULATIONS <br /> <br />The successful Proposer shall comply with all federal, state and local rules and regulations apply <br />to operating a similar type of business. Special attention must be paid to the regulations outlined <br />by the State of Florida, Department of Professional and Business Regulation, Division of Hotels <br />and Restaurants. <br /> <br />2.13 LICENSES. PERMITS AND FEES <br /> <br />The proposer shall obtain and pay for all licenses, permits and inspection fees required for this <br />project; and shall comply with all laws, ordinances, regulations and building code requirements <br />applicable to the work contemplated herein. Damages, penalties and or fines imposed on the <br /> <br />City of Sunny Isles Beach I Request for Proposal No. 12-04-03 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.