My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stanley Consultants Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-04-03 Acoustic Engineering Consult Svcs Town Center Park
>
Responses
>
Stanley Consultants Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2012 11:34:53 AM
Creation date
5/2/2012 11:33:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Acoustic Eng. Consulting Svcs
Bid No. (xx-xx-xx)
12-04-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) ==== === <br />) <br />) <br />) <br /> <br />-.- <br />-.- <br />-.- <br />-' - <br />- - - <br />- - - <br />- - - <br /> <br />_~_.L'j. <br /> <br />AIM Engineering <br />& Surveying, Inc. <br /> <br />Tampa Office <br />5802 Breckenridge Parkway <br />Sui1e 100 <br />Tampa. Florida 33610 <br /> <br />813-627 -41 44 <br />888-627-4144 <br />Fax: 813-664-1899 <br /> <br />Successfully ploviding our clients and the community with quotity plonning engineering and surveying services since 1980, <br /> <br />_J. <br />I <br /> <br />) <br /> <br />) <br />) <br />) <br /> <br />April 24, 2012 <br /> <br />To whom it may concern: <br /> <br />Please accept this letter of recommendation acknowledging Cominey Arena and Stanley <br />Consultants, Inc. for their work on the traffic noise study of the US 41 at CR 951 intersection <br />improvements for Collier County. As a consultant for the Florida Depatiment of TranspOliation <br />(FOOT), I was asked to review the analysis and documentation prepared by Ms. Arena for the <br />project. I found her work to be complete and accurate. She demonstrated a thorough <br />understanding and COlTect application of FOOT and Federal Highway Administration noise <br />study guidelines and procedures. The Noise Study RepOli Addendum, which she prepared, was <br />clear and well written. She was very responsive to requests for additional information and <br />worked hard to meet an aggressive project schedule. I enjoyed working with Ms. Arena on this <br />project and look forward to working with her again in the future. <br /> <br />Sincerely, <br /> <br />S-=~ <br /> <br />Sean Donahoo, PE <br />Vice President <br /> <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.