Laserfiche WebLink
<br />PARKS <br /> <br />~j,;ij1lJ,~~1Ij <br /> <br /> <br />) Chapman Field Park <br />Miami, Florida. <br /> <br />Laura M. Perez and Associates, Inc was the Prime <br />Architectural Firm responsible for the Design, <br />Permitting and Construction Administration <br />Services for the new PedestrianIBicycle Path, <br />Access Road, Bridge, Parking Lot and Canoe Pieri <br />Launching Dock at Chapman Field Park. <br /> <br />The PedestrianlBike Path access road extends Yo <br />miles into the park using one bridge to cross the <br />water way. The Canoe Pier and Launching Dock <br />was designed using a floating dock system in <br />order for the dock to undulate with the tide. The <br />Floating Dock system allows for ADA canoe <br />launching capability. <br /> <br />Extensive coordination with DERM was required <br />in order to obtain mangrove trimming/mitigation <br />and coastal construction permits. <br /> <br />Client: Miami Dade County <br />Parks & Recreation <br /> <br />Location: Miami, Florida <br /> <br />Project: Chapman Field Park <br />PedestrianlBike Path & canoe Dock <br /> <br />" Completion: November 2011 <br /> <br />Cost: $ 1,200,000 <br /> <br /> <br /> <br />LAURA M. PEREZ & ASSOCIATES, INC. <br /> <br />LAURA M. PEREZ AND ASSOCIATES, INC <br /> <br />RFQ #12-04-02 <br /> <br />PAGE 13 <br />