My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Laura M. Perez & Assoc., Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Laura M. Perez & Assoc., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 1:38:18 PM
Creation date
5/7/2012 1:35:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineerign Svcs. Firms Only
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />) Florida International University <br />Multi-Purpose Baseball Stadium <br />Miami, Florida. <br /> <br />The 2,000 seat Stadium is the home of the Golden <br />Panthers Baseball Team having the capabilities of <br />hosting the collegiate NCAA playoffs. <br /> <br />The Stadium is located in the South West corner <br />of the site and acts as a focal point to the <br />University's 17th street entrance. <br /> <br />The Stadium's design features arches throughout <br />the lower level consistent with the architecture <br />on campus. <br /> <br />The three story high elevation emphasis the main <br />entrance to the Stadium. Its open air double <br />volume space allows for cross ventilation. <br /> <br />The Facility was designed in three levels: <br /> <br />-The lower level consists of the main entry, ticket <br />counter, concessions, coaches and players locker <br />rooms, weight room, therapy/taping room, <br />meeting room, and restrooms. <br /> <br />) -The middle level consists of the stadium seating. <br /> <br />-The upper level consists of the press box, VIP <br />lounge and offices for coaches and staff. <br /> <br />Future build-out will include Baseball Hall of Fame, <br />visitors locker rooms, umpire locker rooms, <br />work room, and offices. <br /> <br />Client: Florida Board of Regents <br /> <br />Location: Florida International University <br />University Park Campus- Miami, FL <br /> <br />Project: New Field and Stadium <br /> <br />Completion: Phase 1-1996 <br />Phase 11- 2000 <br /> <br />LAURA M. PEREZ AND ASSOCIATES, INC <br /> <br />RFQ #12-04-02 <br /> <br />PAGE 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.