My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Laura M. Perez & Assoc., Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Laura M. Perez & Assoc., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 1:38:18 PM
Creation date
5/7/2012 1:35:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineerign Svcs. Firms Only
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Flamingo Elementary School <br />llialeah, Florida. <br /> <br />The 24,000 square feet addition to the existing School <br />,includes a new Media Center, Administration, <br />IGuidance, (2) Resource Rooms, (2) Itinerant Rooms, <br />Music Lab, Art Lab, Science Lab, Computer Lab and <br />a PE Shelter. The entire scope of work was grouped <br />into one main building in order to minimize cost and <br />maximize land area. The new covered walkway was <br />designed as a focal entry point to the new building <br />also serving as the required covered walkway to the <br />existing kindergarten building. <br /> <br />As part of the site development a new parking lot was <br />provided for the new construction and the existing <br />parking was completely remodeled. The PE Shelter <br />was located on the North side of the site allowing for <br />joint use of the public park. <br /> <br />The existing Media and Administration Suite was <br />remodeled to include (4) Bilingual Resource rooms <br />for a total of 3,000 square feet. The teachers lounge <br />was renovated to include new HlC Bathrooms. The <br />entire existing school was renovated to include safety <br />to life items. <br /> <br />Client: Miami Dade County School Board <br /> <br />Location: Hialeah, Florida <br /> <br />Project: Addition and Renovation to Existing <br />Elementary School <br /> <br />Completion: Phase I December 1998 <br /> <br />LAURA M. PEREZ AND ASSOCIATES, INC <br /> <br />RFQ #12-04-02 <br /> <br />PAGE 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.