My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Laura M. Perez & Assoc., Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Laura M. Perez & Assoc., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 1:38:18 PM
Creation date
5/7/2012 1:35:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineerign Svcs. Firms Only
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />"TURNPIKE SNAPPER CREEK" <br />Fire Rescue Station #53 <br />Miami, Florida. <br /> <br />Laura M. Perez and Associates, Inc. was <br />responsible for the preparation of the <br />Design-Build Drawing for the <br />new TURNPIKE SNAPPER CREEK <br />FIRE RESCUE STATION. <br /> <br />The 6,300 sf. building is on a one-acre <br />"\ site located near The Snapper Creek <br />Service Plaza. The interior design <br />J arranges spaces to provide maximum <br />efficiency for rescue and fire fighting <br />functions. <br /> <br />The station's Contemporary design and <br />proposed building materials complements <br />the surrounding architecture. The strongly <br />defined main elevations identifies and sets <br />it apart from other fire rescue stations and <br />serves as the facility's focal point. This is <br />achieved by means of height, change of <br />plane, color, texture and/or materials. <br /> <br />CUen t: <br /> <br />Metro Dade <br /> <br />Location: <br /> <br />Miami, Florida <br /> <br />Project: <br /> <br />Design Build <br />Fire Rescue Station. <br /> <br />Completion: <br /> <br />December 1999 <br /> <br />Cost: <br /> <br />Total cost $950,000 <br /> <br />,;, <br />MAIN ELEVATION <br /> <br /> <br />.' <br /> <br />. FLOOR PLAN .' <br /> <br />.,;:~ <br /> <br />LAURA M. PEREZ & ASSOCIATES, INC. <br /> <br />LAURA M. PEREZ AND ASSOCIATES, INC <br /> <br />RFQ #12-04-02 <br /> <br />PAGE 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.