Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) (j) <br />) c <br />0 <br />) .- <br />-f-I <br />) m <br />() <br />) 4= <br />) m <br />) ::J <br />) a <br />) <br />) N <br />) C <br />) 0 <br />.- <br /> -f-I <br />) () <br />) (J) <br />) (f) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />CR~EN lHO/lllPSON <br /> <br />f1 <br /> <br />& AsSOCIi'l's INC <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. :1..2.-04-04 /'."'''''\ <br />DES/CiN AND PERM/lTlNCi SERVICES OF THE INTRACOASTAL PARKS ::;':::::..,::':" <br /> <br />COCONUT CREEK COMMUNITY CENTER <br />COCONUT CREEK, FLORIDA <br /> <br /> <br />OWNER / CLIENT: <br />Mr. Scott Sundermeier, Director <br />City of Coconut Creek <br />Public Services Dept. <br />4800 West Copans Road <br />Coconut Creek, Florida 33063 <br />Phone: (954) 973-6780 <br /> <br />TOTAL CONSTRUCTION COST: <br />$5,300,000.00 <br /> <br />COMPLETION DATE: <br />Design: 2004 <br />Construction: 2005 <br /> <br />CONSTRUCTION SCHEDULE: <br />18 Months <br /> <br /> <br /> <br />Craven Thompson and Associates, Inc. <br />was responsible for civil engineering, <br />site planning, landscape architecture, <br />and construction management for this <br />8.2 acre community center. The master <br />plan includes sports courts, an <br />amphitheatre, play areas, boardwalks <br />and jogging paths. The site is <br />extensively landscaped with buffer <br />planting and berming on all sides. The <br />design includes two interpretive areas <br />with butterfly gardens. This state-of- <br />the-art Community Center facility <br />replaces an outgrown and outdated <br />facility on the same site. <br /> <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />2134 <br />