My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Craven Thompson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 2:22:18 PM
Creation date
5/7/2012 2:07:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Archit. & Engin. Svcs. Firms Only
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
) <br />) <br />) <br />) <br />) <br />) CJ) <br />) c <br />) 0 <br />.- <br />- } -+-' <br />CO <br />) () <br />) ti= <br />) CO <br />) ::J <br />) a <br />) <br />) N <br />) C <br />) 0 <br /> .- <br />) -+-' <br />() <br />) (l) <br />) (j) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />J <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. :1..2.-04-04 <br />DES/CiN AND PERM/lTlNCi SERVICES OF THE INTRACOASTAL PARKS <br /> <br />IIChapgl~J!i <br /> <br /> <br />George English Park <br />Fort Lauderdale, Florida <br /> <br />Contact: <br /> <br />Ms. Alice Shapiro, AlA <br />City of Fort Lauderdale <br />100 N, Andrews Avenue, 4th Floor <br />Fort Lauderdale, FL 33301 <br />Phone: (954) 527-6856 <br /> <br />Construction Cost: $1,715,000.00 <br /> <br />The Chappell Group, Inc. provided structural design services and environmental resource <br />permitting for the reconstruction of an existing recreational park located along the Middle River <br />in the City of Fort Lauderdale and Craven Thompson & Associates, Inc. <br /> <br />Design and permitting services included the reconstruction of an existing docks and boat ramps, <br />as well as the stabilization of eroded shorelines utilizing natural limestone rip rap. <br /> <br />Permitting services included fast track permitting of all work within the basin and along the <br />Middle River, through agencies including South Florida Water Management District, U.S. Corp. <br />of Engineers and Broward County Environmental Protection Department. <br /> <br />Construction completed in August 2005 within the City's construction schedule and under <br />budget. <br /> <br />Pompano Beach, Florida <br /> <br />C"",,'N lHOMPsON <br /> <br />f1 <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />& AsSOCIi'l's INC <br /> <br />."...., <br /> <br />,..,:,;+;-;::::.., <br /> <br />2153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.