Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) C/) <br />) c <br />) 0 <br />.- <br />) -+-' <br />CO <br />) 0 <br />) tt= <br />) CO <br />) ::J <br />) a <br />} <br />) N <br />) c <br />) 0 <br /> .- <br />) ........, <br />0 <br />) (1) <br />) (/) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. :1..2.-04-04 <br />DES/CiN AND PERMIlTlNCi SERVICES OF THE INTRACOASTAL PARKS <br /> <br />IIChapg,~l!1 <br /> <br /> <br />Phase I Environmental Site Assessment <br />Jaco Pastorius Park <br /> <br />Contact: <br /> <br />Steve Williams, P,E, <br />Jacobs Engineering Group, Inc. <br />800 Fairway Drive, Suite 190 <br />Oeerfield, FL 33441 <br /> <br />The Chappell Group, Inc, (TCG) was subcontracted by Jacobs Engineering Group, Inc, to <br />perform Phase I Environmental Site Assessment for the City of Oakland Park, The subject site <br />was comprised of a property consisting of four (4) existing vacant parcels located on Dixie <br />Highway and NE 40th Court in the City of Oakland Park, Florida, The objective of a Phase I <br />ESA is to identify recognized environmental conditions associated with the subject property and <br />adjacent properties, TCG conducted aerial reviews, site inspections, and file reviews for <br />hazardous and petroleum contaminants that could have been potential impacts to the soil and <br />groundwater of the subject site. <br /> <br />The Phase I Environmental Site Assessment was completed by TCG in March 2008, <br /> <br />Pompano Beach, Florida <br /> <br />CR~EN lHOMPSON <br /> <br />(j/ <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />& ASSOCIi'l's INC <br /> <br />(I' '''''''' <br /> <br /> <br />,~.:.:::~::::.., <br /> <br />2155 <br />