Laserfiche WebLink
) <br />) <br />') <br />) <br />) <br />) <br />) <br />) <br />- ) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />2.4 <br /> <br />installation, including a schematic grading plan to ensure continual ADA access throughout and to <br />all elements. <br /> <br />Pedestrian Waysides <br />The CGA team will prepare and present alternative concepts in image or sketch form for a family of <br />related furnishing to be sited at pedestrian waysides and other locations throughout, including <br />lighting, seating, shelters, litter receptacles, bike racks, drinking fountains or other elements. Based <br />on City feedback, the CGA team will refine the selected alternative and prepare a Site Furnishings <br />Schedule identifying the manufacturer, make and model or detailing construction designs for <br />pedestrian wayside elements. <br /> <br />Landscape Enhancements (Scale: 1"=20'-0") <br />Using the Schematic Walkways and Facilities Layout as a basis, the CGA team will prepare <br />preliminary landscape plans to identify any affecting vegetation, locate planting areas, and identify, <br />by type, significant canopy trees, screening planting and other planting types as well as <br />maintenance requirements for all landscape areas. Based on City feedback, the CGA team will refine <br />the selected landscape plan supplemented with a proposed plant list. <br /> <br />Use, Wayftnding, Distance and Interpretive Markers <br />Using the Schematic Walkways and Facilities Layout as a basis, the CGA team will prepare and <br />present alternative conceptual plans, supplemented with sketches and images, identifying possible <br />locations, subject matter and design approaches for use, wayfinding, distance and interpretive <br />features throughout the park. <br /> <br />Preliminary Opinion of Cost Estimate <br />The CGA Team will prepare a preliminary Opinion of Cost Estimate to gauge all construction <br />elements to ensure that all elements can be implemented within the established $1 million <br />construction budget. <br /> <br />City Review 30% <br />CGA will submit a complete set of all 30% plans to City Staff for review and comment. CGA will <br />meet with City Staff review all comments and obtain direction for further development to be <br />reflected in 60% plans. <br /> <br />Task 3 - Design Development and 60% Plans <br />3.1 Design Development <br />Using the reviewed 30% Plans as a basis coupled with city-issued directives, the CGA team will <br />further develop the design to incorporate all modifications requested and modify all plans <br />accordingly. Additionally, CGA staff will further the detailing of all components to the project to <br />include installation details of selected equipment, furnishings, lighting fixtures, etc. Inherent in the <br />development of the 60% construction plans, the CGA team will conduct a thorough <br />"Constructability Analysis" of all project elements through our Quality Assurance Program to ensure <br />that construction issues and design conflicts are addressed pro actively. <br />3.2 Preliminary Technical Specifications <br />The CGA Team will develop revised Technical Specifications to reflect construction and installation <br />specifications for all planned components, particularly with an attention to criteria necessary to <br />address <br />3.3 Refined Opinion of Cost Estimate <br />The CGA Team will prepare a refined Opinion of Cost Estimate to gauge all construction elements <br />modifications to ensure that all elements can be implemented within the established $1 million <br />construction budget. <br />3.4 City Review 60% <br />CGA will submit a complete set of all 60% plans to City Staff for review and comment. CGA will <br /> <br />RFQ 12-04-04 Sunny Isles Beach Intracoastal Parks <br /> <br />4-2 <br />