My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen-Moore & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Chen-Moore & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 2:48:03 PM
Creation date
5/7/2012 2:42:11 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & Permit, Svcs of Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Subconsultants' Experience <br /> <br />) <br /> <br />Carty Architecture (Architecture) <br /> <br />Moore Park Athletic Facility, Miami, FL <br /> <br />The Moore Park Athletic Facility is a legacy gift from the Orange Bowl Committee to the City of Miami. <br />Moore Park was the site of the first Orange Bowl game 75 years ago. The design includes a new synthetic <br />turf field, running track and field event facilities, 1,500 bleachers, press box, coach boxes, restrooms, <br />clubroom and concession facilities for both home and away teams, an electronic score board and <br />competition field lighting. <br />I <br /> <br /> <br />River Park Aquatic Center, Naples, FL <br /> <br />The River Park Aquatic facility is due to be completed in June of 2012. The project is a replacement <br />aquatic facility for the River Park neighborhood. It is located adjacent to an existing Community Center. <br />The new pool consists of a six-lane lap pool, a learn-to-swim area and a zero entry portion with a large <br />play feature. There are restroom and shower facilities as well as a lifeguard office, a ticket booth and a <br />covered entry. <br /> <br /> <br />YMCA of South Dade, FL <br /> <br />The new YMCA of South Dade is due to be complete in December 2012. Judy Carty was the Principal in <br />charge of the project while she was a principal at Borrelli + Partners. She is the Architect of record for <br />the project. The facility sits on a five-acre site and includes a fitness center, a two-court gymnasium, a <br />splash pad, a pool with play features, multipurpose meeting rooms, a child watch center, locker rooms, <br />family locker rooms, fitness studios, outdoor playground, outdoor basketball courts, a multipurpose <br />field, and parking for 300 cars. <br /> <br /> <br />CH <br /> <br /> <br />II <br />UfO NIJ.12-tlt/-04,Desiy" lIIIt! I'ermittillg Services /lftlJe IIItra/'llll,~tall'arks; <br /> <br /> <br />&ASsoclA'h:s <br />
The URL can be used to link to this page
Your browser does not support the video tag.