Laserfiche WebLink
CH~RE <br /> <br />) &ASSOCIAfF5 <br /> <br />Peter J. Duena, PE <br />Associate Engineer <br /> <br />Education <br />Bachelor of Science, Civil Engineering, <br />University of Florida, 2006 <br /> <br />Registration <br />Professional Engineer, Florida, 73781, 2012 <br /> <br />Professional Affiliations <br />. American Society of Civil Engineers <br />. Florida Engineering Society <br />. Southeast Civil Gators <br /> <br />Summary <br />Mr. Dueno currently serves as a senior <br />engineer with Chen Moore and Associates. <br />He is currently a project engineer on the City <br />Center and South Pointe Right of Way <br />Improvement Projects for the City of Miami <br />Beach. He has also worked as a project <br />~ngineer in neighborhood improvement <br />'-ojects for the Cities of Dania Beach, North <br />I <br />IVJiami Beach, Key West, and Pinecrest, as <br />well as Miami-Dade DERM. His experience <br />includes planning, pavement marking and <br />signage, streetscape, stormwater modeling <br />and design, water main design, permitting, <br />and cost estimating. <br /> <br />Project Experience <br />North Miami Beach NE 168th Street <br />Right-of-Way Improvements. Mr. Dueno <br />was responsible for planning, pavement <br />marking and signage, streetscape, <br />stormwater modeling and design, and cost <br />estimating. Chen Moore and Associates <br />designed stormwater improvements, <br />traffic/roadway modifications, sidewalks with <br />ADA grading considerations and on-street <br />parking improvements for the mixed use <br />neighborhood of North Miami Beach. Services <br />included survey, geotechnical investigation, <br />design, permitting, bidding assistance and <br />limited construction observation services. <br /> <br />Miami Beach City Center Right-of-Way <br />Improvement Project. Mr. Dueno was <br />responsible for planning, pavement marking <br />and signage, streetscape, water main design, <br />permitting, and cost estimating. Chen Moore <br />and Associates is the prime consultant <br />responsible for the planning, design, <br />permitting, and construction administration <br />for enhancements within the public right of <br />way areas of Lincoln Road between <br />Washington Avenue and Collins Avenue for <br />the City of Miami Beach. The project included <br />extensive public coordination due to the high <br />profile nature of this segment of Lincoln Road. <br />Unique Sidewalk/crosswalk materials and <br />patterns were utilized along with specialized <br />tree wells, a proposed median and extensive <br />landscaping with uplighting to provide a <br />pedestrian friendly environment and <br />distinctive look to this prominent area of the <br />City. In addition to the streetscape elements, <br />new bus stop areas and shelters, stormwater <br />drainage improvements and roadway <br />resurfacing are proposed. The project <br />required extensive coordination with FOOT <br />due to improvements proposed along Collins <br />Avenue (State Road) and the specialized <br />materials specified, <br /> <br />Miami Beach South Pointe Phase <br />III/IV /V - Right-of-Way Improvement <br />Project. Mr. Dueno was responsible for <br />planning, pavement marking and signage, <br />streetscape, stormwater modeling and <br />design, permitting, and cost estimating.. <br />Chen Moore and Associates is responsible for <br />providing surveying, planning, geotechnical <br />investigation, design, permitting, preparation <br />of construction documents, bid and award and <br />construction engineering and inspection <br />services for infrastructure improvements <br />within the public right of way areas of the <br />South Pointe III/IV/V neighborhood of Miami <br />Beach. The project encompasses <br />approximately 19,000 LF of ROW <br /> <br />RFQ No. 12-04-04 Design and Permitting Services of the Intracoastal Parks <br /> <br />3-18 <br />