Laserfiche WebLink
<br />Submitted by Chen Moore and Associates <br />Camilo Monroy, EI <br />Construction Services Department Manager <br />Professional Service Industries, Inc. <br /> <br />) <br /> <br />Year started with PSI: <br />Years experience with other firms: <br /> <br />2003 <br />1 <br /> <br />Education <br />. Master of Science in Construction Management, Florida International University, 2008 <br />. Bachelor of Science in Civil Engineering, University of Miami, 2003 <br /> <br />Certifications/Reg istrations/T ech n ica I Trai n i ng <br />. Project Manager, PSI, 2003 <br />. Radiation Safety, Density Gauge Operator, PSI, 2003 <br /> <br />Affi I iations/Memberships <br />. American Society of Civil Engineers (ASCE), Member <br /> <br />Professional Experience <br />Mr, Monroy is Construction Services Department Manager in PSI's Miami, Florida office, He has <br />experience in geotechnical engineering and construction and materials testing (CMT). Mr, <br />Monroy's CMT experience includes post tension inspections, vibration monitoring, and pile load <br />testing and analysis, His geotechnical and CMT projects have included single and multi-story <br />residential developments, commercial, institutional, industrial and manufacturing facilities, public <br />and private infrastructure projects such as shopping malls, universities, bridges, roadways, and <br />airports, <br /> <br />Mr. Monroy is also proficient in field project management and report preparation, He is currently <br />responsible for overseeing budgeting, field coordination, technical reporting, reviews, billing of <br />several projects, and coordination of a staff of fifteen (15) field and laboratory technicians, <br /> <br />Summary of Professional Experience <br /> <br />~ Inspection of Foundation Installation including: Augercast, Driven Piles, Pressure Injected <br />Footings Caissons and Load Testing <br />~ Field and Laboratory Testing of Soils <br />~ Post Tension Inspections <br />~ Engineered Fill Placement Monitoring <br />~ Field and Laboratory Tests on Concrete <br /> <br />Representative Project Experience <br /> <br />. South Pointe Park, Miami Beach, Florida (2009) <br />. Fresh Market, Miami Beach, Florida (2009) <br />. 5th and Alton, Miami Beach, Florida (2007) <br />. Florida Marlins Ballpark (2012) <br />. Miami Beach Senior High School, Miami Beach, Florida (2008) <br />. Port of Miami, Area 3, Miami, Florida (2009) <br />. Miami International Airport - North Terminal Development - Miami, Florida (2011), <br />. Miami International Airport - South Terminal Expansion/Renovation - Miami, Florida (2007). <br />. Key West Airport, Key West, Florida (2008). <br />. FOOT Kendall Drive Widening, Miami, Florida (2009). <br /> <br />RFQ No. 12-04-04 Design and Permitting Services of the Intracoastal Parks <br /> <br />~;, <br />l~ <br /> <br />3-28 <br />