|
<br />Submitted by Chen Moore and Associates
<br />Camilo Monroy, EI
<br />Construction Services Department Manager
<br />Professional Service Industries, Inc.
<br />
<br />)
<br />
<br />Year started with PSI:
<br />Years experience with other firms:
<br />
<br />2003
<br />1
<br />
<br />Education
<br />. Master of Science in Construction Management, Florida International University, 2008
<br />. Bachelor of Science in Civil Engineering, University of Miami, 2003
<br />
<br />Certifications/Reg istrations/T ech n ica I Trai n i ng
<br />. Project Manager, PSI, 2003
<br />. Radiation Safety, Density Gauge Operator, PSI, 2003
<br />
<br />Affi I iations/Memberships
<br />. American Society of Civil Engineers (ASCE), Member
<br />
<br />Professional Experience
<br />Mr, Monroy is Construction Services Department Manager in PSI's Miami, Florida office, He has
<br />experience in geotechnical engineering and construction and materials testing (CMT). Mr,
<br />Monroy's CMT experience includes post tension inspections, vibration monitoring, and pile load
<br />testing and analysis, His geotechnical and CMT projects have included single and multi-story
<br />residential developments, commercial, institutional, industrial and manufacturing facilities, public
<br />and private infrastructure projects such as shopping malls, universities, bridges, roadways, and
<br />airports,
<br />
<br />Mr. Monroy is also proficient in field project management and report preparation, He is currently
<br />responsible for overseeing budgeting, field coordination, technical reporting, reviews, billing of
<br />several projects, and coordination of a staff of fifteen (15) field and laboratory technicians,
<br />
<br />Summary of Professional Experience
<br />
<br />~ Inspection of Foundation Installation including: Augercast, Driven Piles, Pressure Injected
<br />Footings Caissons and Load Testing
<br />~ Field and Laboratory Testing of Soils
<br />~ Post Tension Inspections
<br />~ Engineered Fill Placement Monitoring
<br />~ Field and Laboratory Tests on Concrete
<br />
<br />Representative Project Experience
<br />
<br />. South Pointe Park, Miami Beach, Florida (2009)
<br />. Fresh Market, Miami Beach, Florida (2009)
<br />. 5th and Alton, Miami Beach, Florida (2007)
<br />. Florida Marlins Ballpark (2012)
<br />. Miami Beach Senior High School, Miami Beach, Florida (2008)
<br />. Port of Miami, Area 3, Miami, Florida (2009)
<br />. Miami International Airport - North Terminal Development - Miami, Florida (2011),
<br />. Miami International Airport - South Terminal Expansion/Renovation - Miami, Florida (2007).
<br />. Key West Airport, Key West, Florida (2008).
<br />. FOOT Kendall Drive Widening, Miami, Florida (2009).
<br />
<br />RFQ No. 12-04-04 Design and Permitting Services of the Intracoastal Parks
<br />
<br />~;,
<br />l~
<br />
<br />3-28
<br />
|