Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />1= 1 <br /> <br />savinamiller <br /> <br />DES GN STUD 0 <br /> <br />LANDSCAPE ARCHITECTURE I URBAN DESIGN I ARCHITECTURE <br /> <br /> <br />PARKS <br />KEY BISCAYNE <br />CIVIC CENTER PARK <br /> <br />Civic Center Park is located at the key arrival point for the Village 01 Key Biscayne, <br />and will function as the central park/plaza space surrounded by the Community <br />Center, Village Hall and Fire Station. The design concept is to welcome residents <br />and visitors to the Village cultural area with a eontemporary open space which <br />reflects the island's tropical atmosphere, while encouraging its use as a place to <br />meet and come together as a community. In keeping with the island's geography <br />and historic stewardship of its ecology, CCP will incorporate the use of extensive <br />water features, native and naturalized Palms and other flowering plants, and a <br />balanee between paving and green areas. To further encourage day and nighttime <br />use, programming for concerts and lectures are planned, as well as a splash <br />fountain and small ice cream vendor stand. <br /> <br />Location: Key Biscayne, FL <br />Serviee: Schematic Design thru Construction <br />Principal Firm: Savino & Miller Design Studio <br />Date: on-going <br />Project Cost: $2 Million <br />Client: Village of Key Biscayne <br />Contact Info: Jud Kurlaneheek 305.365.8908 <br />Principal in-charge: Barry Miller <br />Project Manager: Courtney Hochman <br /> <br />_,.a.!!!!.!!~ <br /> <br />24 J <br />