Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />LANGAN <br /> <br />-.. ~.l;;~'~~""--- <br /> <br />;'41 <br /> <br />~ <br /> <br />~f ~< ~J ~., ~~ :4' '~'>';l:~:'~~~~. ~~.,,~k,~:" ~y:;*~~::~:,;" ~~_~}~;,,;,,:~~~ ~~~f; ~:~:~~ ': ':!~l~_ _:: ,1~!.,;~ <br />MIAMI DOLPHINS'WATERRARKATSUN'L:IEI:1!S;t ADIU M, <br />~-,,;L,~;~~'~.:~'-.::: ~i,)o~~~~ ~:-"o}.'_ *~-::~~~:~~}~~~',~~_; ~~,.~::~~~~*!;~~ ~;'1:~};~: - y~c,: t~~':,t@~ ~i4fi~.-~ -~~~~~~ ';~ ~:~/ri\ff~~:~.~_~ <br /> <br />~ ;:'~i <br /> <br />'i';; {J, <br /> <br /> <br />fA ~_:%:: <br /> <br />SERVICES: <br /> <br />. Parking Facility Design <br />. Transportation Planning <br />. Traffic Engineering <br />. Parking Design <br />. Event Operations Planning <br /> <br />LOCATION: <br /> <br />Miami Gardens, Florida <br /> <br />CLIENT: <br /> <br />The Related Companies <br /> <br /> <br />) <br /> <br /> <br />li."'Rl'JIII.~;.Ifj"lr:TI..r;I.."l[~li"Ncmtri1!!l:l;[..!i t'.all! 1!1l!1 <br /> <br /> <br />Langan is providing Traffic and Parking due diligence services <br />to The Related Companies to assist in the preliminary through <br />schematic design planning phases of the Dolphins Water Park <br />project. The waterpark will be located in one of the existing <br />Sun Life Stadium parking lots. Our transportation scope was <br />developed to provide planning and engineering support <br />services with respect to Access Management, Vehicular and <br />Pedestrian Circulation, as \Nell as Parking Allocation and <br />Management. <br /> <br />To date for this project, Langan has: <br /> <br />. Designed a revamped Stadium parking layout of <br />approximately 20,000 spaces in order to absorb the1,500 <br />spaces to be lost by the development of the water park. <br />. Evaluated zone specific parking for tailgating, redistributed <br />ADA compliant spaces to attain improved access to the <br />stadium, and relocated the bus drop-off and pick-up sites <br />to provide better circulation. <br />. Examined impacts of game day travel patterns as a result <br />of new development in the vicinity of the Stadium. <br />. ReviellVed the current operations plan with the Stadium <br />Management team and developed suggestions for <br />improvement. <br />. ReviellVed the site access configuration and made <br />recommendations for roadway improvements, inclUding <br />identification of areas that may require signalization. <br /> <br />481 <br />