My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Savino & Miller Design Studio
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Savino & Miller Design Studio
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 2:52:54 PM
Creation date
5/7/2012 2:49:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & Permit. of Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />\ <br /> <br />~WHlC~ <br />- QUALIFICATIONS FOR THIS CONTRACT . . - - <br />. (Present as many projects as requested by the agency, or 10 projects, if not specified. , <br />, , " H."" : CompleteOlleSectionFforeachproject) "".. ,~' -,. ---:.: <br /> <br />20, EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />21. TITLE AND LOCATION ICityand State) <br /> <br />22. YEAR COMPLETED <br /> <br />Greynold Park <br />Miami, Florida <br /> <br />PROFESSIONAL SERVICES <br />2001 <br /> <br />CONSTRUCTION (if applicable) <br />2001 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Miami-Dade Park & <br />Recreation Department <br /> <br />b. POINT OF CONTACT NAME <br />Mr. Ivan Rodriguez <br />R.J. Heisenbottle Architects, P.A. <br />2199 Ponce de Leon Boulevard <br />Coral Gables, FL 33134 <br /> <br />c, POINT OF CONTACT TELEPHONE NUMBER <br /> <br />Tel. 305-446-7799 <br />irodriQuez@riha.net <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) <br />Scope/Description; <br />Douglas Wood Associates, Inc. provided the complete structural engineering services for the historical W.P.A. park buildings <br />including four Iimerock and wood-framed buildings (boat house, lagoon overlook and picnic shelter, restroom and park office). <br />This was a phased effort beginning with investigations and evaluations followed by multiple projects for the repair, restoration and <br />enhancement of the various historical and non-historical buildings in the park. Estimated Construction Cost: $4 Million <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />(2) FIRM LOCATION ICity and State) (3) ROLE <br />Coral Gables, Florida Structural Engineering <br /> <br />I (1) FIRM NAME <br />a. I Douglas Wood Associates, Inc. <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION ICily and State) (3) ROLE <br />b. <br /> - - <br /> (1) FIRM NAME (2) FIRM LOCATION ICityand State) (3) ROLE <br />c. <br />d. (1) FIRM NAME (2) FIRM LOCATION ICityand State) (3) ROLE <br /> (1) FIRM NAME (2) FIRM LOCATION ICity and State) (3) ROLE <br />e. <br />f. (1) FIRM NAME (2) FIRM LOCATION ICityandState) (3) ROLE <br /> (1) FIRM NAME (2) FIRM LOCATION ICily and State) (3) ROLE <br />g. <br />h. (1) FIRM NAME (2) FIRM LOCATION ICityand State) (3) ROLE <br /> <br />~~\'lIII'Jf..~nlr:ril.I;I.."I['liNtml[.a:~;['.ij"../!'ll!!.'llll <br /> <br />sd <br />
The URL can be used to link to this page
Your browser does not support the video tag.