Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />, <br />) <br />} <br />} <br />) <br />) <br />) <br />) <br />) <br /> <br />RESUME <br /> <br />-J..' ..."LU <br />~. ,.,... .~...."- <br /> <br />Victor M. Avedano, PE, LEED AP, QCxP <br />Principal/President <br />Senior Mechanical Engineer <br /> <br />Mr. Avedano has a wide range of experience in the design of HVAC, Plumbing <br />and Fire Protection Systems. He is in charge of all Engineering activities in our <br />office. He has over 37 years experience in the design and construction <br />administration of various transportation, commercial and institutional facilities. <br />His work experience includes the following project types: Commercial and <br />Institutional Buildings, Transportation (airports, train stations), Educational <br />Facilities (K-12 and Universities) and Hospitality (Hotels and Resorts). <br /> <br />SELECTED PROJECT EXPERIENCE <br /> <br />Miramar Regional Park, Phase II - Aquatic Center <br />Miramar, Florida <br />JALRW provided the HVAC, Plumbing and Electrical Engineering for the buildings <br />in Phase II of this new 173-acre park. Phase II contained two baseball/softball <br />fields and the Aquatic Complex with an interactive water playground and beach <br />area. The water playground resembles Castaway Island currently located at TY <br />Park and the pool offers swimming lanes and a dive well. These athletic fields <br />are used to host regional baseball/softball tournaments along with adult and <br />youth leagues. Victor was the Mechanical Engineer for this project. <br /> <br />Robert King High Park Community Center and Soccer field <br />Miami, Florida <br />JALRW provided the Mechanical and Electrical Engineering and the Lighting <br />Design for this new 6,500 square foot Community Center building including <br />covered basketball court, new tennis court, lighting, parking, and playground & <br />picnic area. A second phase of this project is currently in construction and <br />consists of an illuminated soccer filed with adjoining restrooms. Victor is the <br />Mechanical Engineer for this project. <br /> <br />South Regional / Broward College Library <br />Pembroke Pines, Florida <br />JALRW provided HVAC and Electrical Engineering Design Services for this new <br />70,000 square foot regional library project on Broward Community College's <br />south campus. The library is provided with daylight controls and energy efficient <br />dimmable lighting, CO2 sensors, demand control ventilation, dedicated outside <br />air units with pre-treated outside air and heat pipe energy recovery. It is the first <br />LEED certified project for Broward County and has achieved a Silver rating from <br />the U.S. Green Building Council. Mr. Avedano was a member of the Mechanical <br />Engineering team for this project. Construction Cost: $11,000,000 <br /> <br /> <br />Years of Experience: <br />37+ <br /> <br />Education: <br /> <br />National University of <br />Cordoba, Argentina <br />Bachelors of Science - <br />Mechanical and <br />Electrical Engineering, <br />1971 <br /> <br />Registration: <br />Professional Engineer <br />State of Florida - #42459 <br /> <br />Professional <br />Associations: <br />American Society of <br />Plumbing Engineers, <br />National Fire Protection <br />Association, American <br />Society of Heating, <br />Refrigerating & Air <br />Conditioning Engineers <br /> <br />Savino & Miller Design Studio - RFQ #12-04-04 <br /> <br />59 <br />