My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Savino & Miller Design Studio
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Savino & Miller Design Studio
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 2:52:54 PM
Creation date
5/7/2012 2:49:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & Permit. of Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />, <br />I <br /> <br />) <br /> <br /> <br /> <br />Johnson, Avedano, Lopez, Rodriguez & Walewski Engineering Group provided the <br />Mechanical and Electrical Engineering and the Lighting Design for this new 6,500 square <br />foot Community Center building including covered basketball court, new tennis court, <br />lighting, parking, playground & picnic area. This project is currently under construction for <br />an estimated cost of $1.2 M. A second phase of this project consists of an illuminated <br />soccer filed with adjoining restrooms. Phase II of this project has not been constructed. <br /> <br />OWNER: City of Miami <br />CONSTRUCTION COST: $3,600,000 <br />COMPLETION DATE: 2011 <br /> <br /> <br />...J~~!'ll <br />_:~ <br />65) <br />
The URL can be used to link to this page
Your browser does not support the video tag.