Laserfiche WebLink
Calvin, Giordano & Associates, Inc. <br />E% i E P T 1 0 N A L S 0 L LI T 1 0 N S <br />I B <br />A standard inventory of survey equipment for each crew includes: <br />• Total Stations data collectors and levels <br />• Hydrotrac HT 100 Echo Sounder <br />• Geopack CAICE, EFB, CEFB <br />• Civil 3D 2008 <br />• Microstation V8 <br />• Vector (GPS baseline processing) <br />• Cyclone 5.6 Laser Scanning software <br />• Tracemaster Pipe and Cable Locator <br />• Leica Scan Station II <br />• AutoCAD <br />• VSI VaXcavator (slurry excavation system) <br />• Trimble Geomatic Office <br />• AutoCAD LDD 2008 <br />CONSTRUCTION MANAGEMENT <br />CGA believes key elements of construction management include: contract <br />negotiation, implementing quality control and assurance programs, contract <br />document review, shop drawing approval, review and administration of <br />contractor RFI's, observation of field activity to assure construction is completed <br />in accordance with construction documents, payment request recommendation, <br />change order administration, environmental and NPDES monitoring, field report <br />and documentation, as -built record drawing preparation, and agency /permit <br />closeout documentation and certification. As part of being a Municipal <br />Consultant for several local governmental entities, we are constantly involved <br />and up to date in all related agencies requirements and procedures; we have <br />served as construction management for over $100 million dollars Capital <br />Projects, successfully assisting in the bidding, selection of contractor, <br />construction and final certifications, in conjunction with different design <br />consultants and clients. <br />RFQ #12- 04 -02, Traffic Engineering and Transportation Consulting Page 215 <br />