Laserfiche WebLink
Calvin, Giordano & Associates, Inc. <br />E X C E P T 1 0 N A L S O l U T 1 0 N 5 <br />e <br />CITY TRAFFIC ENGINEER <br />Weston, Florida <br />CGA has been engaged as the City Traffic Engineer for the City of Weston since 1996. <br />The city traffic engineering program includes the maintenance of traffic operations for <br />all intersections and roadways throughout the City. <br />CGA provides comprehensive traffic engineering services including intersection <br />analysis, signalization analysis and design, roundabout analysis and design, roadway <br />level of service analysis, public school traffic operational analysis, city -wide traffic <br />modeling, city -wide traffic count database maintenance, corridor signal timing <br />progression analysis, traffic calming and neighborhood traffic mitigation. <br />In addition to general traffic engineering services, CGA reviews site plan applications <br />with respect to traffic engineering impacts on behalf of the City, responds to citizen <br />inquiries regarding traffic engineering, and coordinates the interests of the city with <br />Broward County Traffic Engineering Division and FDOT District IV. <br />Client <br />City of Weston <br />Contact information <br />at time of project: <br />John Flint <br />City Manager <br />17200 Royal Palm Blvd <br />Weston, Florida 33326 <br />(954) 385 -2000 <br />Project Date <br />1996 to the Present <br />Services Provided <br />General Traffic Engineering <br />Consulting Services <br />Site Plan Reviews <br />Principal in Charge <br />Shelley Eichner, AICP <br />Team Members <br />Jeffery Maxwell, PE, PTOE <br />James Spinks, PE, PTOE <br />Bryan Kelley, PE <br />Company Role <br />Prime <br />Consultant Cost <br />$224,000 /year <br />Change Orders <br />None <br />TE 0026 WestonCityTrafEng I Page 2110 <br />