Laserfiche WebLink
Calvin, Giordano & Associates, Inc. <br />E X C E P T 1 0 N A L S 0 L U T 1 0 N 5 <br />Y <br />TATUM WATERWAY DRIVE TRAFFIC ANALYSIS <br />Miami Beach, Florida <br />t ) <br />Calvin, Giordano & Associates developed a comprehensive traffic analysis of Tatum <br />C Waterway Drive. The analysis considered converting Tatum Waterway Drive between <br />77th Street and 79th Street from the existing two -way traffic flow to one -way only <br />operation. <br />CGA collected existing conditions data and performed alternatives analysis using <br />Synchro traffic simulation software. Consideration was given to the existing school <br />access patterns within the project vicinity. <br />Client <br />City of Miami Beach <br />Contact Information <br />at Time of Project <br />Richard W. Saltrick <br />City of Miami Beach <br />1700 Convention Center Dr. <br />Miami Beach, FL 33139 <br />(305) 673 -7071 <br />Project Date <br />2009 <br />Services Provided <br />Traffic Engineering <br />Analysis <br />Principal in Charge <br />Shelley Eichner, AICP <br />Team Members <br />Jeffery Maxwell, PE, PTOE <br />James Spinks, PE, PTOE <br />Bryan Kelley, PE <br />Consultant Cost <br />$50,000 <br />TE 0025 Tatum Waterway Dr I Page 2117 <br />