Laserfiche WebLink
Calvin, Giordano & Associates, Inc. <br />E X C E P T 1 O N A L S O L LI T 1 O N 5 <br />I a <br />SABRINA BAGLIERI <br />Director, Construction Administration <br />SUMMARY OF QUALIFICATIONS <br />Ms. Baglieri has over 23 years civil engineering /construction management experience. <br />She is an expert in the selection, setup, management, and control of roadway, parks and <br />EDUCATION <br />buildings projects: from the bidding processes to their completion and culmination. She <br />B.A., Civil Engineering, <br />is also experienced in the management practices of hurricane debris collection <br />Universidad Rafael Urclaneta <br />monitoring and data recording and with LAP compliance issues. Ms. Baglieri has <br />Maracaibo, Venezuela <br />working computer knowledge on operative systems such as DOS, Windows and the <br />following programs: Cadd2000, Excel, Microsoft Word, Timberline, Construction Link <br />CERTIFICATIONS <br />(CLI), Primavera, PowerPoint, and Quattro Pro for Windows. <br />Governor's Hurricane <br />Conference <br />Ms. Baglieri has extensive experience and knowledge directly applicable to all types of <br />Recovery Disaster - The <br />projects, relying on her background in engineering, construction and project <br />Local Government Role <br />administration. Furthermore, she is well versed in the municipal processes necessary to <br />get work tasks completed on time, as well as she has demonstrated experience working <br />Erosion Control Certified <br />within allocated budgets. These skills and aptitudes have all been exercised in her <br />Inspector <br />capacity as Director of Capital Improvements for several local municipalities through <br />CTQP Final Estimates 1 <br />Calvin, Giordano & Associates' various continuing services municipal contracts. The <br />breadth of her work has spanned all realms of implementation projects - from small <br />CTQP Earthwork <br />Construction Inspector 1 <br />residential - scale, community - scale, and urban scale. As such she has the necessary <br />knowledge in the management of the dynamics inherent in work scheduling, tasking, <br />CTQP Asphalt Paving <br />sequence matrices necessary to maintain continuity of work and fulfillment of the <br />Technician Level 1 <br />assessed milestones. These are important issues, especially when dealing with LAP <br />OSHA Construction Safety <br />funding, grants monies, bond assessments, and in both responding to the expressed <br />+ Health <br />needs of the community and to the management of complaints and issues in an <br />expedited manner <br />PROJECT EXPERIENCE <br />City of Weston, Florida Projects <br />• Vista Park: <br />- Boulevard: new roadway construction <br />- Vista Park Development: Construction of 4 soccer fields, 4 softball fields, 2 <br />concession buildings, a maintenance building, and parking area. Provided <br />lighting, lift station, water and sewer designs <br />• Traffic Signals for Weston Road /South Commerce Parkway <br />• Tequesta Trace Concession Building Parking and Drainage <br />• Bonaventure Master Plan Phase I, II, III and IV. Upgrade of all drainage, <br />landscape, and roadway elements <br />• Saddle Club Rd @ South Post Road Roundabout <br />• Bonaventure Blvd. @ Blatt Road Roundabout <br />• New traffic signals for Weston Road /North Corporate Lakes <br />• FS 55 Emergency Signal <br />• Saddle Club /Arvida /Bonaventure overlay of roads and road /drainage <br />improvements <br />• Bonaventure /Racquet Signal <br />• Regional Park /Parking Modification. Construction of Loop Road to connect <br />existing parking lots <br />Page 3132 <br />