My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
SRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2012 10:22:41 AM
Creation date
5/22/2012 10:18:17 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIIS - PROJECT EVALUATION Tuesday, March 13, 2012 - 2:29:22 PM <br />MIAMI -DADE COUNTY, FLORIDA <br />MIAMI - ADE Capital Improvements Information System <br />Water and Sewer <br />Consultant Evaluation <br />Evaluation Type: Standard Evaluation <br />Contract: E06- WASD -03 Work Order No: 1 <br />Contract Name: Design of Upgrades for the MDWASD's Sanitary Sewer Pump Stations <br />Award Amount: $1,250,000.00 Contact: Maria Lopez <br />786 -552 -8526 <br />Contract Type: PSA <br />Contractor/ SRS Engineering, Inc. FEIN: 650607552 <br />Consultant: <br />PROJECT TECHNICAL CERTIFICATION REQUIREMENTS: <br />Page 1 of 2 <br />TYPE CODE DESCRIPTION <br />Prime 6.02 WATER AND SANITARY SEWER SYSTEMS - MAJOR WATER AND SANITARY SEWAGE <br />PUMPING FACILITIES <br />Prime 17.00 ENGINEERING CONSTRUCTION MANAGEMENT <br />Other 9.02 SOILS, FOUNDATIONS AND MATERIALS TESTING - GEOTECHNICAL AND MATERIALS <br />ENGINEERING SERVICES <br />Other 11.00 GENERAL STRUCTURAL ENGINEERING <br />Other 12.00 GENERAL MECHANICAL ENGINEERING <br />Other 13.00 GENERAL ELECTRICAL ENGINEERING <br />Other 15.01 SURVEYING AND MAPPING - LAND SURVEYING <br />Other 16.00 GENERAL CIVIL ENGINEERING <br />Evaluator ID: lopez75 Date: 3/13/2012 Period: Completion of study or design <br />Rating <br />®��� <br />N/A <br />Criteria <br />Schedule - Quality of schedule & adherence to schedule <br />resulting in timeliness and minimizing delay to the owner and <br />community. <br />Cost effectiveness &efficiency - Budget compliance &value of <br />work. <br />Vision - Design - Concepts or adherence to criteria. <br />Cooperation - Teamwork &relationship with owner, subs and <br />suppliers. <br />Coordination - Ability to organize, schedule and complete <br />tasks in adherence to the schedule. <br />6- <br />Accuracy & Technical Skills - Cost estimating, scheduling, <br />shop and other drawings, plans, manuals, project <br />documentation and conflict resolution. <br />I' IFy,�F--�F--]F--]F---] <br />Completeness - Compliance with contract documents, permits, <br />mhtuil:file://C: \Users \srs21\AppData\ Local \Microsoft \Windows \Temporary Internet Files \... 3/13/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.