My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Atkins North America, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Atkins
>
Atkins North America, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2012 2:03:39 PM
Creation date
5/31/2012 1:58:41 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engin. Svcs.
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning and Urban Design | 3-1 <br />Atkins | City of Sunny Isles Beach, RFQ No. 12-04-020006.027944.0512 <br />contract with David Haight performing as project manager <br />and coordinator for urban design services. Mr. Haight’s AICP <br />certifi cation is provided on the next page. <br />An organizational chart of the proposed team is shown on the <br />next page, followed by a summary table of staff availability. <br />Key personnel resumes begin on page 3-4. <br />3. Staffi ng <br />Organization chart <br />Atkins strives to provide stability and continuity in the members <br />of every proposed design team. The individuals assigned <br />to this project were selected due not only to their technical <br />capabilities, but also for their dedication to the team and to <br />their clients. It is our intent to provide a consistent team from <br />project start to completion. <br />Larry Levis, senior group manager of architecture, will <br />serve as principal-in-charge and will be responsible for this <br />AICP certifi cations CNU-A certifi cation
The URL can be used to link to this page
Your browser does not support the video tag.