Laserfiche WebLink
www.bermelloajamil.com <br />of existing active recreation park with three baseball fi elds, pedestrian walking path and restroom/ <br />press box/concession building. <br />Forest Hill Boulevard Improvements, Wellington, Florida* - Activities included coordination and <br />supervision of irrigation sub-consultant; preparation of landscape construction drawings; coordinated <br />improvements with FDOT; provided assistance to Village staff during construction on shop drawings <br />and responses to “request for information” on major improvements to corridor including irrigation <br />mainline, irrigation pump stations, landscape, landscape lighting and roadway resurfacing; <br />Florida Hospital, Orlando, Florida* - Responsibilities included coordination with architect and civil <br />engineer, supervision of junior landscape architect on the design of an entry garden including dry <br />river bed and boulder outcroppings, prepared trellis, column and seat wall construction drawings, <br />prepared landscape plans, prepared speciality paving and furniture specifi cation drawings, <br />prepared parking lot landscape construction drawings. <br />Roadway Enhancement Project Phase IV, Tamarac, Florida* - Supervised junior landscape architect <br />in development of landscape concept and construction drawings; prepared bidding documents; <br />provided bid analysis to City; supervised construction observation by junior landscape architect for <br />25 miles of roadway median landscape improvements. <br />Ibis Golf and Country club Hurricane Mitigation and Restoration, West Palm Beach, Florida* - <br />Prepared landscape improvements/replacement drawings after Hurricane Francis and Jeanne for <br />single family residential community; activities included base plan development; creation of master <br />plant material list; conceptual design synthesis; pubic presentations; preparation of landscape <br />construction and tree relocation plans. <br />Hollywood Beach Streetscapes, Hollywood, Florida* - Integral team member and leader on <br />streetscape improvement project which included reconstruction of six streets on Hollywood Beach <br />including undergrounding of overhead wires, new roadway cross section, curbing, sidewalks, <br />speciality pedestrian and vehicular paving, landscape, irrigation and creation of pedestrian plazas <br />adjacent to the Broadwalk. <br />Belvedere Road I-95 Exit Ramp Landscape, West Palm Beach, Florida* - Responsible for conceptual <br />landscape plan to be included in Keep Palm Beach County Beautiful Grant Application; FDOT <br />coordination on drawing approval as well as right-of-way permit; prepared landscape construction <br />drawings; prepared technical specifi cations and opinion of probably cost; prepared bidding <br />documents; performed construction observation assistance to City staff. <br />Richardson Residence, Wellington, Florida* - Designed hardscape and landscape improvements; <br />prepare conceptual design as well as hardscape and landscape construction drawings. <br />Antonio/Maeder Residence, West Palm Beach, Florida* - Designed hardscape and landscape <br />improvements; prepare conceptual design as well as hardscape and landscape construction <br />drawings. <br />Big Blue Trace Landscape Buffer, Wellington, Florida* - Responsible for landscape design, coordination <br />of irrigation sub consultant and coordination with FPL for appropriate regulatory approvals for <br />landscape improvements along public roadway right-of-way to screen panoramic views of high- <br />voltage overhead wires. <br />Lauderdale Lakes ‘The Island’, Lauderdale Lakes, Florida* - Responsible for hardscape and <br />landscape design and detailing as well as bidding and construction assistance for improvements <br />to a triangular shaped half-acre parcel at the junction of three roadways including 20’ sign/water <br />wall, pedestrian/event plaza and landscape. <br />Kirk J. Olney, RLA <br />Landscape Architect <br />37