Laserfiche WebLink
Jim Kloes <br />Construction Manager <br /> <br /> <br />2010, Orange County Medical Examiners Facility Orlando, FL – Mr. Kloes was the Construction Manager on this project. <br />SGM provided engineering services for plumbing and fire protection systems. Our fire protection submittal included complete <br />sprinkler layout, specifications, and hydraulic calculations. The plumbing drawings show required pipe routing and sizes <br />supplying each plumbing fixture. In addition, specifications were provided to show the required product materials, <br />equipment, execution, and testing for all systems being used. Our contract also included construction administration which <br />required periodic site inspections, shop drawing review, RFI responses, and meeting with the AHJ. <br />2010, Orlando Science Center HVAC, Lighting, Power, Plumbing & Fire Protection Energy Assessment, Orlando, FL <br />Mr. Kloes was the Construction Manager for this project. SGM was commissioned to provide engineering services to <br />identify and recommend the best and most economical and energy efficient method of correcting the HVAC equipment <br />located at the Orlando Science Center Complex. Responsibilities included: operation and the deficiencies associated with <br />the operation. Inspect the facilities in areas of HVAC, lighting, power, Fire Alarm, security system, Plumbing & FP system. <br />Review the as-build and compare with actual conditions to learn more about the operation. Attend meetings with MRI, City <br />PM and owner’s rep to coordinate the activities and review SGM’s findings. Identify all the deficiencies associated with <br />building’s HVAC, lighting, power, fire alarm, plumbing & FP systems. Provide a break down and inspection report including <br />executive summary outlining the cost and improvement plan for the building operation. <br />2010, Orange County Government Fire Station 35, Orlando, FL – Mr. Kloes was the Construction Manager for LEED <br />enhanced commissioning, developed the owners OPR documents, reviewed drawings, during construction, developed the <br />commissioning plan, attended construction meetings, witnessed equipment start up, performed functional performance tests <br />on the equipment and provided Test & Balance services. <br />2009, Orange County Government District 9 Medical Examiner’s Office Facility, Orlando, FL – Mr. Kloes was the <br />Construction Manager for the District Nine Medical Examiner’s Office which is a 41,283 SF facility that consists of three <br />separate buildings: Medical Examiner’s Office, Morgue and Decomposition Morgue. The building is one of the first green <br />Medical Examiner’s offices in the nation. This LEED Certified building will reduce its water consumption by 40 percent in one <br />year with the use of low-flow fixtures and native landscaping. <br />2007, City of Titusville, Fire Command Center, Titusville, FL – Mr. Kloes was the Construction Manager for the building <br />assessment report regarding the MEP conditions of the City of Titusville’s Fire Command Center. SGM determined and <br />identified current issues for life safety, ADA, HVAC, IAQ and power/electric systems. SGM also prepared cast estimates for <br />associated deficiencies that were outlined in the report. The City utilized the report to request funding based on the findings. <br />2007, Orange County Corrections Central Utility Plant Chiller Expansion, Orlando, FL – Mr. Kloes was the <br />Construction Manager for the existing central chiller plant which was required to meet the campus HVAC needs. <br />Additionally, Mr. Goykhman provided designs for the upgrade of the building electrical and lighting systems. <br />2007, City of Orlando, Barker Park, FL – Mr. Kloes conducted the construction management of this project that’s scope <br />was to design supplementary lighting to ensure safety at night in the park which spanned over 8 acres. The project cost was <br />$50,000. <br />2007, City of New Port Richey Recreation and Aquatic Center, New Port Richey, FL – Mr. Kloes was the Construction <br />Manager for the renovation of the thirty-seven year old existing recreation center and addition of a new 37,000 SF complex <br />with a gymnasium, locker rooms, fitness center and meeting rooms. Exterior lighting was added for the outdoor tennis <br />courts, parking lots, basketball courts, shuffleboard courts, and walking trails. <br />2003, City of Maitland Public Works Yard and West Side Fire Station, Maitland, FL –Mr. Kloes was the Construction <br />Manager for the entire Public Works Yard and West Side Fire Station. The scope consisted of four new structures including <br />the grounds maintenance building, fleet maintenance building, offices and shops combined to make a two-story building, <br />and the West Side Fire Station. The surrounding areas are designated for general park and recreational areas.