Laserfiche WebLink
C <br />ROBS 6N431NECRONG, ANC. <br />ensure that the project was constructed as designed. One of Mr. Ross's specialties is his <br />extensive knowledge in drainage stormwater modeling and design. Some of Mr. Ross's work <br />includes design of stormwater masterplans for the City of North Miami Beach Basin 5 <br />Improvements, Doral and Immokalee, and has designed storm water pump stations for the City <br />of North Miami Basin 5 Improvements. Mr. Ross was the drainage district reviewer and <br />planning Engineer at Central Broward Water Control District. <br />Ms. Melissa Ross, Ross Engineering's Utilities Project Engineer has worked on many <br />Neighborhood Improvement Projects as well as many other Municipal projects and has <br />provided water and sanitary sewer design and analysis for many different municipalities. <br />Currently, Ms. Ross is working as the Construction Engineering Manager with Miami Dade <br />County's Water and Sewer Department on the rehabilitation of over 2 million feet of sanitary <br />sewer gravity pipes throughout Miami Dade. Ms. Ross is involved in the sanitary sewer <br />manhole inspections, pump station wet well inspections, sewer gravity main CCTV inspections, <br />and also provides a report to the County to include the repairs of the identified defects and <br />provide repair recommendations. <br />Ross Engineering has a great reputation with the permitting agencies in obtaining the permits <br />in record time. We strive to keep the client happy. <br />Our proposed project manager for this project is Robert J. Ross, P.E., who has a total of 18 <br />years of project management experience, 9 of which are with Ross Engineering, Inc. The role <br />of the project manager, Robert J. Ross, P.E. is to serve as a point of contact for the <br />engineering contract. Mr. Ross, as overall manager / facilitator, will review each task work <br />order and coordinate closely with the appropriate task team leader to accurately define the <br />scope, fee proposal and schedule . Throughout each task work order, Mr. Ross will routinely <br />review the progress being performed to ensure the project is on schedule, that proper agency <br />coordination is being done, and that the work product receives proper QA/QC before submittal. <br />Mr. Ross will also serve as Ross Engineering's Principal in Charge and will be the Engineer of <br />Record for all task work orders and will provide QA/QC and constructability review for all <br />design work. <br />In all its endeavors, Ross Engineering, Inc. seeks to bring the highest level of service to its <br />clients: (1) Highest Professional Expertise available. (2) Careful Quality <br />Assurance /Quality Control on all its work. (3) Cost - Effective Solutions to all of our client's <br />projects. <br />Thank you for the opportunity to submit this proposal. We look forward to providing you with <br />our services in an effective, efficient, on- schedule and on- budget manner. <br />Sincerely, <br />Robert J. Ross, P.E. <br />Principal <br />Ross Engineering, Inc. <br />City of Sunny Isles Beach RFQ 12 -04 -01 <br />Continuing Professional Architectural & Engineering Services Individuals Only (CCNA) <br />6 <br />