Laserfiche WebLink
GORA4^ <br />1 <br />�1�UI The City of Coral Gables <br />mss•_ ��, <br />Public Works Department <br />2800 SW 72 AVENUE <br />MIAMI, FLORIDA 33155 <br />CERTIFICATION <br />The City of Coral Gables Public Works Department certifies that the engineer Mr. <br />Juan S. Calderon, P.E., PTOE has served as Marlin Engineering, Inc Project <br />Manager leading the Coral Gables Citywide Traffic Study. <br />City Project Manager: Esther Zabalo (305) 460 -5018 <br />Project Cost: $ 250,000.00 <br />General Description: The purpose of this contract is to analyze traffic problems <br />within the City related to speeding, high volume, mobility, traffic intrusion, and <br />L JI traffic calming solutions. <br />I Among other tasks developed during this project were: <br />I� <br />1 <br />• Traffic data collection <br />• Land use evaluation <br />• Origin- Destination studies <br />• Design of intersection <br />• Improvements and traffic calming <br />• Level of service analyses <br />• Traffic circulation <br />• Feasibility assessments <br />• Cost estimates <br />• Public involvements <br />R. Alberto Delgado, P.E. <br />Public Works Director <br />e ZS 4)� <br />at + <br />r <br />P.O. Box 141549 CORAL GABLES, FLORIDA 33114-1549 PHONE (305) 460 -5000 FAx (3 ) 460 -5080 <br />