My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G. Batista
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-01) Professional Architectural and Engin. Svcs - Individulas Only CCNA
>
Responses
>
G. Batista
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 2:13:54 PM
Creation date
6/12/2012 2:08:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs. Individuals
Bid No. (xx-xx-xx)
12-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FI G. BATISTA <br />&ASSOCIATES <br />➢ Reduced project costs <br />➢ Decreased overall time in planning and design <br />➢ Anticipated needs in terms of schedule <br />➢ Continuity throughout the project <br />➢ Continuous control of the projects <br />15 <br />Our commitment to service is the driving principle of a construction management relationship. Our <br />involvement from the earliest stages of design through the final close -out of construction ensures that <br />your expectations are fully realized. This approach provides checks and balances for each team <br />member, enabling important decisions to be made and programmed early. <br />The key element to a successful construction manager is effective planning. Early involvement in the <br />preconstruction phase allows us to establish project controls at the beginning of design development, <br />addressing all issues that affect the constructability, cost and schedule of a project. Value <br />management is offered throughout the project providing optimum value and quality. <br />As the project transitions into construction, we can <br />move with the project. Knowledge from the <br />preconstruction phase is transferred to actions in the <br />field. At this point in the project, no one knows the <br />details better than the construction team, who, through <br />preconstruction activities, have been instrumental in <br />each step and major decision along the way. <br />Through the construction management approach, Mr. <br />Batista's expertise in both design and construction is <br />available for your benefit, providing unique solutions and recommendations and ultimately providing <br />you with a comprehensive construction program, maximizing your budget, minimizing your time and <br />building to the highest quality standards. <br />ABILITY TO MEET THE DESIRED TIMELINES AND DEADLINES <br />We do not know of any company that will employ a losing marketing strategy of advertising their <br />inability to meet deadlines. But as a licensed, successful and seasoned General Contractor, Mr. <br />Batista knows first -hand the importance of "doing what you say you are going to do ". Even through <br />these hard economic times, Mr. Batista is a continually sought -after professional due to his <br />unblemished reputation as delivering on his promises. Those that do not, simply wither away in this <br />A /E /C industry, where those that survive, are professionals that consistently provide cost - effective, <br />timely and quality services. <br />CITY OF SUNNY ISLES BEACH <br />RFQ No. 12 -04 -01 <br />i I , <br />
The URL can be used to link to this page
Your browser does not support the video tag.