My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G. Batista 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-01) Professional Architectural and Engin. Svcs - Individulas Only CCNA
>
Responses
>
G. Batista 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 2:37:03 PM
Creation date
6/12/2012 2:22:39 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural & Engineering Svcs. Individuals
Bid No. (xx-xx-xx)
12-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />G G. BATISTA <br />21 0 <br />International School Of Health, Beauty & Technology <br />5950W. Oakland Park Blvd <br />Lauderhill, FL 33313 <br />Telephone 954-306-3576Fax; 954-306-8101 <br />www.ishbt.edu <br />April 25, 2012 <br />City of Sunny Isles Beach <br />Purchasing Department <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br />RE: Reference letter for Greg Batista, PE <br />To whom it may concern: <br />Let this letter serve as a reference for Greg Batista and his company G. <br />Batista & Associates. Last year Mr. Batista performed a design - build of a <br />23,000 square foot conversion of office spaces to a beauty school which <br />includes classrooms, beauty salons, dentistry, and laboratories here in <br />Lauderhill, Florida. <br />I was the owner's representative for this project for the International School <br />of Health and Beauty. Mr. Batista was both the designer of record for the <br />entire design which included all the structure and the mechanical, electrical <br />and plumbing which were basically done from scratch since the entire area <br />was demolished. Having Mr. Batista also as the General Contractor for this <br />project was also of immense help since the completion of the project was <br />done in a mere 16 weeks. This was important to us since we needed to open <br />for business quickly. <br />Mr. Batista's exceptional understanding of the design, engineering and <br />construction of a difficult and complex job such as this, was instrumental in <br />its success and timely completion. <br />1 <br />If you should have any questions, please call me. <br />Sincerely, <br />Ir�- <br />Sheetal Bha <br />Director <br />CITY OF SUNNY ISLES BEACH <br />RFQ No. 12 -04 -01 <br />. I <br />
The URL can be used to link to this page
Your browser does not support the video tag.