My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-05) Utility Undergrounding Consultant Services
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 10:58:23 AM
Creation date
6/13/2012 10:55:10 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Consultant Svcs
Bid No. (xx-xx-xx)
12-04-05
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 <br />Scope of Services / Technical Specifications <br />3.0 SCOPE OF SERVICES <br />Of SUN P"' <br />Project Management and Engineering Consulting Services necessary for the undergrounding of all <br />overhead electric, telephone and cable TV utilities within the city limits of Sunny Isles Beach. <br />Work shall include but not be limited to: <br />Project liaison services <br />Coordination of all the design work by the service entities involved <br />Coordination of all permitting needed to complete the work. <br />Cost estimates and budgeting for all work necessary <br />Preparation of RFP for installation contracting services, Contract Procurement and total <br />Project Management of the work <br />Contractor evaluation services <br />Development of easement configurations <br />Development of project as builds <br />Feasibility studies <br />Utility negotiations <br />Consolidated construction plans <br />Construction Management Services <br />Neighborhood /resident information and status updates <br />Utilization and implementation of the latest utility technology <br />Coordination & management of all public information /out -reach meetings and notices <br />Utilities design service for conversion to underground <br />Provide project team with single point of contact for City Manager and Staff. <br />Surveying <br />The sub - consultant will be required to work with the City and the service entities to establish the <br />phasing & scheduling of the project. <br />3.1 BACKGROUND <br />Portions of the undergrounding <br />familiarize themselves with the <br />appropriate FPL representatives. <br />3.2 COORDINATION <br />have already been completed by FPL. The consultant shall <br />extent of the undergrounding already by contacting the <br />The consultant shall coordinate when necessary with all utilities such as FPL, North Miami Beach, <br />Atlantic Broadband and Etc. <br />3.2.1 INSTALLATION OF NEW LIGHT POLES <br />City of Sunny Isles Beach I Request for Proposal No. 12 -04 -05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.