|
1.
<br />J David Hernandez
<br />Page 2
<br />3104 — 12104, FDOT— District VI, Construction District -wide CTQP Quality Control Team, Broward County. Senior Roadway
<br />and Plant Inspector assigned to assist and coordinate between field inspection personnel at the asphalt plant and lab personnel to
<br />obtain the heights quality and performance on all the ongoing projects in FDOT- District VI. Contact: Gus Graupera, P.E. (305)499 -
<br />�� 2354.
<br />4103 — 3104, Seminole Tribe of South Florida, SR 441 widening from Griffin Road to Sheridan Street, Broward County.
<br />Senior Roadway Inspector responsible for inspection of new drainage installation, utilities, road widening, lighting and
<br />signalization, landscaping, and miscellaneous concrete inspections. Contact: Bob McSweeny, P.E. (954) 776 -1616.
<br />2103 — 4103, FDOT- District IV, District -wide CE &I; Broward County. Senior Roadway Inspector assigned to drainage widening
<br />and reconstruction SR -60, in Palm Beach County. Assist in Final Estimates, worked on finalizing various projects from the Stuart
<br />and Palm Beach County offices. Contact: Ricardo Estripeaut, P.E. (954) 486 -1400.
<br />5102 — 2103, Key Deer Reconstruction Projects, Monroe County. Senior Roadway Inspector assigned to Key Deer Project,
<br />Grouping of 11 projects included 3 major and 8 minor construction contracts totaling in excess of $26 million. The work included
<br />construction of 2 new bridges, roadway widening, and roadway rehabilitation along the US -1 corridor. The scope also included use
<br />of Geo -wall construction, MSE wall construction, installation of new drainage, traffic signal and traffic counter installation, milling
<br />and resurfacing from Key West north to Key Largo. The majority of the projects entail working in extremely environmentally
<br />sensitive and protected areas. Contact: Kevin Baker, P.E. (305) 289 -6100
<br />i J 1996 — 2002, Field Manager, H &R Paving, Inc., Miami, Florida.
<br />• FDOT- District VI, Miami -Dade County. Highway Asphalt Maintenance Contract Nos. E6771, E6815, E6821, E6868. Milling
<br />f and resurfacing throughout Miami -Dade County and Monroe County. Project Manager, Jesus Valderrama, P.E. (305) 470 -
<br />t 5347.
<br />• Miami -Dade Department of Public Works, responsibilities included resurfacing and milling and striping. Contract Nos. 24, 26,
<br />c l 38, 44, and a QNIP Sidewalk ADA Rehab and new construction installation. FEMA drainage projects throughout Miami -Dade
<br />County. All were completed on schedule. Project Manager, Javier Busto, P.E.
<br />• City of Miami, responsibilities included resurfacing and striping. Project completed on schedule.
<br />1995 — 1996, Inspector Level II, L.C. Consulting Engineering, Rockyhill, Connecticut. Duties included inspection of bridge
<br />rehab, installation of drainage, structures, granite, curb and gutters, milling and resurfacing, barrier wall installations at 1 -95 Project
<br />in Milford, CT.
<br />1994 —1995, Construction Crew Foreman, Star Paving, Inc., Danbury, Connecticut. Duties included supervise a crew of 20
<br />employees in installation of concrete forms, concrete pour, drainage and structure installation, granite, pre- fabricated curb and
<br />gutter, milling and resurfacing
<br />T=G
<br />TARGET ENGINEERING GROUP, INC.
<br />
|