My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Target Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Target Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 11:46:34 AM
Creation date
6/14/2012 11:36:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />i <br />i <br />i <br />i <br />:i <br />t�i <br />rl <br />i11 <br />. 9 <br />J I <br />Proieet #1: <br />1. <br />2 <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />PROPOSER'S REFERENCES <br />Project Name: S.R. 845 (Powerline Rd <br />Brief description of project: <br />This project consisted on roadway reconstruction, including portland cement concrete <br />pavement as well as asphalt pavement, drainage, signalization, lighting, landscape <br />and irrigation from Atlantic Blvd to north of Copans Rd. This project was designated <br />by MOT to be a "Materials Model" project which means all materials incorporated <br />into the project were tested fro performance, including new innovative products. <br />What services did your firm provide? Construction Engineering Inspection and <br />Administration. <br />Total proposal price, contract period, and final costs: <br />$6,673,030 642 days $6,500,000 <br />(price) (contract period) (final costs) <br />Number of Change Orders processed for the project: Seven 7 <br />Total dollar value of change orders: $ 140,276.98 but Final Dollar Amount under ran <br />on ,ginal amount <br />Owner of project: State of Florida Department of Transportation, District Four <br />(Broward County) <br />Name and telephone number of contact person: <br />James Jeffers, P.E. (954) 776 -4300 <br />Date project was completed: April 14, 2006 <br />Name of personnel that worked on this project and % of time: <br />Name <br />% of Time <br />Sara J Duffoo, P.E. , Project Administrator <br />100% <br />Bruno Torres, Senior Inspector <br />100% <br />
The URL can be used to link to this page
Your browser does not support the video tag.