Laserfiche WebLink
<br />Robert Jackson, PSM, Page 2  <br />City of Pembroke Pine Boundary survey for a 167­acre parcel, Broward County, Florida. In addition  <br />to the information provided by the client, research was required for adjoining ownerships and right‐of‐way  <br />maps for I‐75 corridor as well. The survey was accomplished using and overall static GPS traverse that  <br />included sectional work along with conventional sub‐traverses utilized for finding or setting property  <br />corners and locating improvements. At the completion of the AUTOCAD drawing all aspects of the project  <br />were reviewed for completeness and compliance with Minimum Technical Standards (MTS).  <br />Dania Cove, Dania Beach, Florida. Prepared a Boundary and Topographical survey that delineated mean  <br />high water along the Dania Cut‐Off Canal. All in accordance with the State of Florida minimum technical  <br />standards for land surveys as defined by Chapter 5J‐17.05 of the Florida Administrative Code.    <br />City of Lauderhill, Florida, Storm Water locations­GPS:Project Manager responsible for all survey  <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning  <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure  <br />the project was on time and on budget.  <br />City of Weston, Florida, Sign Inventory­GPS (City of Weston Surveyor): Project Manager responsible  <br />for all survey aspects of this project. Project involved locations of City signage. This included informational  <br />signs and all traffic signs throughout the City. Survey Crews cataloged, height, type of sign and condition  <br />with the Global Positioning System (GPS). Performed quality control throughout the project. Coordinated  <br />weekly meetings to assure the project was on time and on budget.  <br />City of Weston, Florida, Stormwater Improvements­GPS: Project Manager responsible for all survey  <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning  <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure  <br />the project was on time and on budget.   <br />Page 3| 22