Laserfiche WebLink
<br />SABRINA BAGLIERI  <br />Construction Observation/Inspection/Shop Drawing Review  <br />SUMMARY OF QUALIFICATIONS   <br />Ms. Baglieri has over 23 year’s civil engineering/construction management experience.  <br />She is an expert in the selection, setup, management, and control of roadway, parks and  <br />buildings projects: from the bidding processes to their completion and culmination. She  <br />is also experienced in the management practices of hurricane debris collection  <br />monitoring and data recording and with LAP compliance issues.  Ms. Baglieri has  <br />working computer knowledge on operative systems such as DOS, Windows and the  <br />following programs: Cadd2000, Excel, Microsoft Word, Timberline, Construction Link  <br />(CLI), Primavera, PowerPoint, and Quattro Pro for Windows.  <br />Ms. Baglieri has extensive experience and knowledge directly applicable to all types of  <br />projects, relying on her background in engineering, construction and project  <br />administration.  Furthermore, she is well versed in the municipal processes necessary to  <br />get work tasks completed on time, as well as she has demonstrated experience working  <br />within allocated budgets.  These skills and aptitudes have all been exercised in her  <br />capacity as Director of Capital Improvements for several local municipalities through  <br />Calvin, Giordano & Associates’ various continuing services municipal contracts.  The  <br />breadth of her work has spanned all realms of implementation projects – from small  <br />residential‐scale, community‐scale, and urban scale.  As such she has the necessary  <br />knowledge in the management of the dynamics inherent in work scheduling, tasking,  <br />sequence matrices necessary to maintain continuity of work and fulfillment of the  <br />assessed milestones.  These are important issues, especially when dealing with LAP  <br />funding, grants monies, bond assessments, and in both responding to the expressed  <br />needs of the community and to the management of complaints and issues in an  <br />expedited manner  <br />PROJECT EXPERIENCE  <br />City of Weston, Florida Projects  <br /> Vista Park:  <br />‐ Boulevard: new roadway construction  <br />‐ Vista Park Development: Construction of 4 soccer fields, 4 softball fields, 2  <br />concession buildings, a maintenance building, and parking area. Provided  <br />lighting, lift station, water and sewer designs  <br /> Traffic Signals for Weston Road/South Commerce Parkway  <br /> Tequesta Trace Concession Building Parking and Drainage  <br /> Bonaventure Master Plan Phase I, II, III and IV. Upgrade of all drainage,  <br />landscape, and roadway elements  <br /> Saddle Club Rd @ South Post Road Roundabout  <br /> Bonaventure Blvd. @ Blatt Road Roundabout  <br /> New traffic signals for Weston Road/North Corporate Lakes  <br /> FS 55 Emergency Signal  <br /> Saddle Club/Arvida/Bonaventure overlay of roads and road/drainage  <br />improvements  <br /> Bonaventure/Racquet Signal  <br /> Regional Park/Parking Modification. Construction of Loop Road to connect  <br />existing parking lots  <br />EDUCATION <br />B.A., Civil Engineering, <br />Universidad Rafael Urdaneta <br />Maracaibo, Venezuela <br />CERTIFICATIONS <br />Governor’s Hurricane <br />Conference <br />Recovery Disaster – The <br />Local Government Role <br />Erosion Control Certified <br />Inspector <br />CTQP Final Estimates 1 <br />CTQP Earthwork <br />Construction Inspector 1 <br />CTQP Asphalt Paving <br />Technician Level 1 <br />OSHA Construction Safety <br />+ Health <br />Page 3| 25