My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CIMA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
CIMA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 2:20:54 PM
Creation date
6/14/2012 2:13:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I� <br />11 <br />Gateway Park Construction Management Services RFQ# 12 -06 -01 C <br />Perimeter Road at Miami International Airport, Miami, <br />FL: CIMA was the primary consultant on this project <br />providing Construction Engineering and Inspection <br />services, which involved reconstruction of a new 120" <br />culvert and a four lane road on the south side of the <br />airport. The roadway is a critical point of access to various <br />businesses in direct proximity to the airport as well as a <br />connector between major arterial streets. The total cost of <br />the project is $4.8 million and the 300 day construction <br />schedule was completed in June of 2010 on time and <br />within budget. <br />The scope of work on the project included: Converted a 2- <br />lane road into a 4 -lane divided road, Open -Cut drain <br />installation under CSX Tracks, Installation of a 120" <br />corrugated aluminum drain, Installation of Miami - <br />International Airport security fence, Bridge Demolition, <br />Construction of Bridge Culvert and Rip Rap, Drainage and <br />De- Watering, Roadway Reconstruction and Widening, <br />Settlement Plate Observation, Milling and Resurfacing, <br />Signage and Signal Loops, Lighting, Sidewalk, Traffic <br />Separator, Driveway and Curb & Gutter, Landscape Tree <br />Relocation, Utilities Adjustment and Channel <br />Excavation. <br />North Shore Watermain Replacement, Miami <br />Beach, FL: CIMA was the prime consultant for <br />j <br />the City of Miami Beach providing Construction <br />Engineering and Inspection Services on the <br />$635,000 watermain project in the North Shore <br />r <br />area of Miami Beach, from 73rd Street to 85tH <br />!�. <br />y F <br />Street along Byron Avenue, Tatum Waterway and <br />w <br />Dickens Road. The water main was constructed <br />.. <br />j' <br />within a residential neighborhood and involved <br />roadway restorations. CIMA's services included <br /><a <br />daily reporting, resolution of project issues, the <br />�= <br />provision of public information, sampling and <br />j <br />testing of construction materials, and project <br />a _ xa u K, <br />certification as required by the City of Miami <br />Beach. <br />CIMA's Qualification Statement Page 10of16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.