My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CIMA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
CIMA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 2:20:54 PM
Creation date
6/14/2012 2:13:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r� <br />Florida Department of Transportation <br />Hach scorT 605 Suwannee Street ANANTH PRAS.An, P.E. <br />GOVERNOR Tallahassee, FL 32399 -0450 SECRETARY <br />July 12, 2011 <br />1 Jose A. Gonzalez, President <br />CIMA ENGINEERING CORP. <br />rj 4101 Ravenswood Road, Suite 113 <br />Dania Beach, Florida 33312 <br />i <br />Dear Mr. Gonzalez: <br />The Florida Department of Transportation has reviewed your application for qualification package and determined <br />E that the data submitted is adequate to qualify your firm for the following types of work: <br />Group 3 Highway Design - Roadway <br />i <br />3.1 - Minor Highway Design <br />Group 10 Construction Engineering Inspection <br />i. <br />10.1 Roadway Construction Engineering Inspection <br />10.3 Construction Materials Inspection <br />10.4 - Minor Bridge & Miscellaneous Structures CEI <br />Your Unlimited Notice of Qualification shall be valid until June 30, 2012 at such time as your December 31, 2011 <br />overhead audit will be due to comply with the Department's requirement on overhead audits. We will automatically notify <br />your firm 45 to 60 days prior to your update deadline. <br />On the basis of data submitted the Department has approved your accounting system and considers the rates <br />i listed below as acceptable rates for qualification purposes. <br />L <br />Facilities <br />r Home /Branch Field Capital Cost Overtime Published <br />1 Office Office of Money Premium Direct Exoense Fee Schedule <br />Overhead Rate 189.37% 92.10% 0.085% Excluded 7.71 % (Home) Yes <br />14.79% (Field)' <br />� "Rent and utilities excluded from field office rate. These costs will be directly reimbursed on contracts that require the <br />consultant to provide field office. <br />Should you have any questions, please feel free to contact me at 850/414 -4485. <br />LEO /cmr <br />Sincerely, <br />g.AGyn <br />Lorraine E. Odom <br />Professional Services <br />Qualification Administrator <br />www.dot.state.fl.us ® RECYCLED PAPER <br />
The URL can be used to link to this page
Your browser does not support the video tag.