My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fastrack MCI
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Fastrack MCI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 3:56:57 PM
Creation date
6/14/2012 3:46:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Services for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fasirac�rM�� <br />General Contractor, Construction Managers, Design Build & Consultants <br />Sunny Isles Beach Government Center <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />Re: Disputes, Litigation, and Defaults <br />To Whom it May Concern:, <br />Fastrack MCI has NEVER been involved in any: <br />• Construction or A /E- related litigation, action or claim of projects of same or similar <br />size, including but not limited to any action against or by any owner, engineer, <br />architect, contractor, subcontractor, material, men or supplier, whether active, <br />pending, or concluded, at the mediation, arbitration, trial or appellate level. <br />• Project that has failed to be completed or was terminated for default. <br />• Judgments, claims, arbitration proceedings or suits pending or outstanding against our <br />organization or our officers. <br />• Complaints filed with the State Department of Consumer Affairs, Better Business <br />Bureau, or any other agency maintained for consumer protection against our <br />company. <br />• Officer or principal of our organization ever been an officer or principal of another <br />organization when it failed to complete a construction contract. <br />• Discrimination on the basis of race, gender, gender identity or expression, religion, <br />national origin, ethnicity, sexual orientation, age, or disability against any of its sub - <br />consultants, vendors, suppliers, or commercial customers. <br />• Arbitration, administrative proceedings, or lawsuits <br />• Action or lawsuit involving a guaranteed maximum price contract <br />• Liquidated damages, penalties, liens of any kind, defaults, or cancellations of contract <br />or termination of contract were imposed, sought to be imposed, threatened or filed <br />against your organization. <br />• Disputes or o_r claims in which your firm has been a party to and was resolved without <br />legal action <br />• Incident against any member of the team alleging errors and /or omissions, or any <br />breach of professional ethics, including those settled out of court <br />• Disputes or claims -in which our firm has been a party to and resolved without legal <br />action. <br />No claims in any "made by or against Fastrack MCI or any part of the Fastrack <br />MCI team. <br />Since <br />wDania <br />ive Vice President <br />City of Sunny Isles Beach I Request for Qualifications No. 12 -06 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.